Loading...
HomeMy WebLinkAboutC.054.93008_1392HE f Chairman Hedrick asked a question about Twin Oaks Road. Mr. Joel Mashburn inquired about the intersection at Broad Street and Greenbriar Road, what could be done to make it safer at this point? Mr. Rand said there is a flasher at this intersection now. No other improvements are scheduled. Mr. Robertson said the State would be redoing the priority system again this fall and winter. It has been three years since the present priority list was done. The new list will be in effect on July 1, 1989. No one else spoke during the hearing. MOTION from Chairman Hedrick to return to Regular Session. VOTING: Ayes - 4; Nays - 1; Absent - Murdock. PROPOSED 1988-89 SECONDARY ROAD IMPROVEMENT PROGRAM ACCEPTED: MOTION from Chairman Hedrick to accept the Secondary Road Program as presented. VOTING: Ayes - 4; Nays - 0; Absent - Murdock. The following is the program proposed by Department of Transportation: PRIORITY # DESCRIPTION LENGTH AMOUNT 11 W.O. 6.822455 SR 1179 (Oak Tree Road) from Sr 1100 to SR 1250 1.08 GRADE, BASE AND SURFACE ESTIMATED COST $115,000 PREVIOUSLY FUNDED PE & R/W 15,000 FUND REMAINING COST $100,000 100,000 12 SR 1849 (Jericho Road) from SR 1892 to SR 1845 2.10 ESTIMATED COST ROADWAY $241,000 STRUCTURE (Bridge #365) 80,000 TOTAL $321,000 FUND GRADE, BASE AND STR. 275,000 13 SR 1212 (Commodore Loop) from Sr 1112 to SR 1112 .93 GRADE, BASE AND SURFACE 112,000 W.O. 6.822429 (Approved 1987-88 Program SR 2125 from Harmony City Limits to SR 2124 1.50 GRADE, BASE, PAVE AND STRUCTURE REVISED COST ESTIMATE $227,000 PREVIOUSLY SET UP 201,000 FUND REMAINING COST 26,000 26,000 PROPERTY OWNERS' PARTICIPATION t W.O. 6.822456 - SR 2402 from SR 2450 South .65 GRADE, BASE AND SURFACE Q ESTIMATED COST $67,600 PROPERTY OWNERS SHARE 27,600 STATE MATCHING FUNDS $40,000 40,000 PAVED ROAD IMPROVEMENTS SR 2395 from SR 2362 to beginning of 24' Pavement 2.60 WIDEN PAVEMENT FROM 20' to 22' AND RESURFACE 190,000 SR 1598 from N.C. 115 West 1.00 WIDEN PAVEMENT FROM 16' to 20' 45,000 W.O. 6.822445 (Approved 1987-88 Program) SR 2320 from U.S. 64 South 2.02 WIDEN PAVEMENT FROM 18' to 22' REVISED COST ESTIMATED $103,500 PREVIOUSLY SET UP 85,500 FUND REMAINING COST 18,000 18,000 SPOT STABILIZATION 157,000 TOTAL $963,000