HomeMy WebLinkAboutC.054.93008_0831 (2)386
CHAIRMAN HEDRICK ADJOURNED THE PUBLIC HEARING TO REGULAR MEETING.
PROPOSED 1985-86 SECONDARY ROAD IMPROVEMENT PROGRAM
IREDELL COUNTY
PRIORITY DESCRIPTION
LENGTH
AMOUNT
1 SR 1223-A from NC 115 to SR 1224
Grade, Base & Surface
0.08
$ 8,000
2 SR 1697 from SR 1005 to Dead End
Grade, Base & Surface
0.23
22,000
3 SR 2360-N From SR 2359 Southeast
Grade, Base & Surface
0.89
68,000
4 SR from SR 2158 to SR 2169
Grade, Base & Surface
1.14
100,000
5 SR 1835-S From Sr 1837 to SR 1836
Grade, Base, Surface & Structure
Bridge #232
1.17
130,000
W.0.6.822402 SR 2150 From SR 2145 to Dead End
Grade, Base & Surface
.61
23,020
W.0.6.822404 SR 1202 From SR 1102 to Dead End 2,090 LF
SR 1248 From SR 1202 to Dead End 1,150 LF
.62
37,764
W.0.6.822403 SR 1437 From End of Pavement to Dead End
Grade, Base & Surface
0.49
32,150
W.O. SR 1528 From Sr 1526 to Dead End
Grade, Base & Surface
0.36
23,700
W.O. SR 2421 From SR 2316 to Dead End
0.20
t440!i /I b/J ° °
PAVED ROAD IMPROVEMENTS:
W.O.6.822369 SR 2321 From SR 2461 to U. S. 64
Widen Pavement 18' to 22'
1.85 81,000
W.O.6.822396 SR 1004 From Statesville C.L. Southwest
to a point 500' Southwest of Back Creek,
2.27 Miles
Widen Pavement 18' to 22'
Extend Project Southwest to SR 1005
1.60 67,000
SR 2395 From N. C. 115 East
Widen Pavement 18' to 22'
Improve intersection at N. C. 115 & Resurface
0.40 31,000
Spot Stabilization
120,000
TOTAL PROGRAM
$755,449