Loading...
HomeMy WebLinkAboutC.054.93008_0831 (2)386 CHAIRMAN HEDRICK ADJOURNED THE PUBLIC HEARING TO REGULAR MEETING. PROPOSED 1985-86 SECONDARY ROAD IMPROVEMENT PROGRAM IREDELL COUNTY PRIORITY DESCRIPTION LENGTH AMOUNT 1 SR 1223-A from NC 115 to SR 1224 Grade, Base & Surface 0.08 $ 8,000 2 SR 1697 from SR 1005 to Dead End Grade, Base & Surface 0.23 22,000 3 SR 2360-N From SR 2359 Southeast Grade, Base & Surface 0.89 68,000 4 SR from SR 2158 to SR 2169 Grade, Base & Surface 1.14 100,000 5 SR 1835-S From Sr 1837 to SR 1836 Grade, Base, Surface & Structure Bridge #232 1.17 130,000 W.0.6.822402 SR 2150 From SR 2145 to Dead End Grade, Base & Surface .61 23,020 W.0.6.822404 SR 1202 From SR 1102 to Dead End 2,090 LF SR 1248 From SR 1202 to Dead End 1,150 LF .62 37,764 W.0.6.822403 SR 1437 From End of Pavement to Dead End Grade, Base & Surface 0.49 32,150 W.O. SR 1528 From Sr 1526 to Dead End Grade, Base & Surface 0.36 23,700 W.O. SR 2421 From SR 2316 to Dead End 0.20 t440!i /I b/J ° ° PAVED ROAD IMPROVEMENTS: W.O.6.822369 SR 2321 From SR 2461 to U. S. 64 Widen Pavement 18' to 22' 1.85 81,000 W.O.6.822396 SR 1004 From Statesville C.L. Southwest to a point 500' Southwest of Back Creek, 2.27 Miles Widen Pavement 18' to 22' Extend Project Southwest to SR 1005 1.60 67,000 SR 2395 From N. C. 115 East Widen Pavement 18' to 22' Improve intersection at N. C. 115 & Resurface 0.40 31,000 Spot Stabilization 120,000 TOTAL PROGRAM $755,449