Loading...
HomeMy WebLinkAboutC.054.93008_0511 (2)66 completed. Mr. Brooks said it was not scheduled to be completed until next July (1984). Mrs. Frances Murdock, County Commissioner, inquired about a side road off Old Mountain Road into Celeste Estates. She said there was no intersection sign posted and it was hazardous for school buses. People there are requesting signs and speed zones. Mr. Alexander said sneed zones are handled by the Traffic Office, and it was usually left to the people in the community to make decisions about having these signs erected. Mrs. Murdock also inquired about S. R. 2400, and if it would be paved along with the paving of S. R. 2395, to which Mr. Alexander replied that it would be paved at the same time. TRAFFIC LI_HT AT INTERSECTION OF MURDOCK ROAD AND U. S. 21 AND HIGHWAY 115, TROUTMANI Commissioner Ostwalt brought up the subject of a traffic light at the captioned intersection. The state officials said there had been traffic counts at the intersection, but the traffic count did no qualify the intersection for a light. He requested that the board write a letter to David Hoyle with copies to Billy Rose and Ray Spangler, the new division engineer. CHAIRMAN TROUTMAN CLOSED THE PUBLIC HEARING AND RE -OPENED THE REGULAR MEETING. ABANDONMENT OF 207 FEET AND BRIDGE 176 ON S. R. 1933: MOTION from Commissioner Campbell to aDDrove the abandonment of the captioned road and bridge. VOTING: Ayes - 5; Nays - 0. 1983-84 SECONDARY ROAD PROGRAM: MOTION from Commissioner Murdock to approve the proposed 1983-84 Secondary Road Program as presented. VOTING: Ayes - 5; Nays - 0. The following is the orogram as approved by the board: SR# LENGTH STATE FUNDS PRIORITIES #1 SR 1370 From US 64 to SR 1369. Estimated Cost: Grade, Base & Surface $53,000 Fund Grade & Base Only #2 SR 2367 From SR 2342 to Dead End. Estimated Cost: Grade, Base & Surface $50,000 Fund Grade & Base only #3 SR 2395 SR 2362 to Dead End. Estimated Cost: Grade, Base & Surface $77.,000 Fund Grade & Base only #4 SR 1852 SR 1810 to Yadkin County Additional Base & Surface #5 SR 1527- From End of pavement to SR 1526. Estimated 1532 Cost: Grade, Base & Surface 167,000 Structure (Br. #99) 65,000 Total 2 Fund preliminary engineering & structure only #6 SR 1447 From SR 1321 South, Grade, Base & Surface PROPERTY OWNERS' PARTICIPATION W.O. 6.822361 POP $5,400 SR 2145 from SR 2158 East, Grade, Base & Surface 0.66 $ 42,500 0.68 38,850 1.05 53,150 1.91 60,000 2.22 70,000 0.50 41,600 0.26 10,000