HomeMy WebLinkAboutC.054.93009_1769REQUEST FOR APPROVAL OF LANDFILL EQUIPMENT BIDS: (I) A REBUILT f LANDFILL. TRASH COMPACTOR (2) A ROLL -OFF TRUCK AND (3) A REBUILT D-613 BULLDOZER: On January 26, 1998, the following bids were opened: COMPACTOR Bidder Deli Bid Price Comments Landfill & Construction Equip. 60 days $ 130,000 Rex 370, met all specs 60 days 210,000 alt. Rex 370, new engine Marcel Equipment 15-30 days 208,000 alt. A Cat. 8260, met all specs 15-30 days 203,500 alt. B Cat.826C, met all specs 15-30 days 74,900 alt..0 Bomag BC601 not Road Machinery Services 60 work days 145,000 rebuilt, does not meet specs Rex 370, met all specs ROLL OFF TRUCK Carolina Env. Systems, Inc. 120-150 days 85,982 Volvo, met all specs April 1 -April 15 81,921 alt. i Volvo, Cat 300 HP engine 2-3 weeks 81,876 alt.2 Volvo, Cummins 300 HP 82,661 w/ opt. Engine (plus steel fenders and & tool box option - $783) Marathon Equipment Feb. 20 82,859 Mack, 300 HP engine Nu -Life Environmental 10 work days 85,000 Volvo, met all specs Volvo - GMC Truck Center of Carolina ISO days 84,448 Volvo, met all specs D -6D BULLDOZER Allen Church Grading immediate 42,300 Caterpillar D-61), met all specs Carolina Tractor & Equipment 2 days 44,750 Caterpillar D-6, used, not rebuilt Mashburn said N.C. G.S. 143.129 stipulated that," bid awards shall be made to the lowest responsible bidder taken into consideration quality, performance, and the time specified in the proposals for the performance of the contract." He said the County staff had tried to ensure that all bidders met the conditions. Mashburn said he felt the local vendor on the compactor could provide all conditions as well as the lowest vendor, but in keeping with North Carolina laws, it was the states recommendation to go with the Landfill & Construction Company (Missouri). Attorney Pope concurred with the reasoning for this decision. In regards to the truck, the staff recommends Carolina Environmental (Greensboro, N.C.). Pertaining to the bulldozer, the staffrecommends Allen Church Grading (Statesville, N.C.) The county manager said the local vendor indicated that during the period of time the compactor was being manufactured a loaned compactor could be brought in for use. Mashburn said that in trying to assign a value for this, it is already known the County presently pays this vendor $6,000 per month for a compactor. The low bidder stipulated it would be able to deliver anew built piece of equipment within 60 days. Using this information, 60 days would equal $12,000. This would still put the local vendor at $3,000 more than the lowest bidder. MOTION by Commissioner Fortner to award the compactor bid to Landfill & Construction Equipment Company in the amount of $130,000 and to award the roll -off truck bid to Carolina Environmental Systems, Inc. in the amount of $84,167, and to initiate Budget Amendment 933 for these purchases. VOTING: Ayes - 5; Nays - 0. 8