HomeMy WebLinkAboutC.054.93009_0770whether or not they will provide services. They have asked their
consulting engineers, Willis Engineering Company, to evaluate the
demands on the line. Brolin feels optimistic about the sewage
service with Mooresville.
Commissioner Johnson asked about the time frame on the
project. Brolin said the cost of the sewer will be borne by the
private developer. Mooresville's policy is that if the lines are
extended, Mooresville will take it over. Brolin said Thomas Wilson
Properties is willing to "foot the bill." He pointed out some other
development that is taking place in the area that would be served
by the sewer line and they have indicated a willingness to help
bear some of the cost of extending the line.
Wanda Young. The time frame is to get started on the closest
corner, which is the residential office, sometime in late summer.
It depends upon how soon they can get the sewer. They have a back-
up plan besides the City of Mooresville. They will have to have
sewer. The prospect of getting water along with the sewer from the
Town of Mooresville makes the plan of getting the services from the
Town of Mooresville the most feasible plan, Young said.
Chairman Haire asked for other questions and/or comments.
There were none.
Chairman Haire closed the public hearing.
MRs. A. P. MORRISON EEIRS (TRhD O. MORRISON, EXECUTOR OF
ESTATE) PROPERTY, CASE 39411-4: MOTION from Commissioner Madison
to approve the rezoning as requested and recommended by the
planning board with one additional Conditional Use being placed on
the property, and that being the placement of a 100' buffer on the
south side of the property, which the developers have said they
would accept, and also the other conditional used on the GB CUD,
which are:
The following uses are being excluded:
bottling works
bus repair and storage terminals
mobile home display lots
trucking terminals, transfer companies
wholesale storage of gasoline and oil products (including
bottled gas and oxygen)
circuses and carnivals, on a temporary basis, not to exceed
seven (7) days
dairy products processing and distributing facilities
feed and seed stores
freezer lockers and ice plans
public works and public utility facilities, including service
and storage yards
tire recapping shops
vending companies
Substitute MOTION from Commissioner Boone that an additional
condition in the GB CUD zone be that any race shops have
restrictive covenants that will provide reasonable noise abatement
measures, and that any open garage doors be turned so as to face
away from the border of the property. Secondly, that the proposed
R -O zone be R-0 CUD, the condition being that there not be in
excess of 120 dwelling units built in that area.
Commissioner Madison said he would incorporate the substitute
motion as a part of his motion.
This property is located at the southeast corner of NC Highway
15OW and McCrary Road, more specifically identified as Lot 1, Block
C, of Iredell County Tax Map 2P.
VOTING: Ayes - 5; Nays - 0.
JAN 3190'9 751