Loading...
HomeMy WebLinkAboutC.054.93009_2162Cttrrent A Certificates $ 924 Proposing 41/o increase G Certificates 1,673 11" Martin said the Iredell-Statesville supplement average was $1,300 compared to the state average of $1,700 per teacher per year. Barnard said the state bond money was "trickling" down and the I -S system had about $4 million left. Long and Sinclair then presented the following suggested funding plan through year 2002. Proposed Funding Plan for Iredell Statesville Schools Facility Needs (*Ail Estimates in 1999 Dollars) 1999-2000 COPS Lakeshore Middle (Phase Will) 7.85 m New Southern High school 24.20m Annex Replacement 2 62m TOTAL 34.67m Additional Capital Outlay Request for 2000-2001 Troutman Middle Cafe Expansion Asom Scotts Sewer Upgrade .250m North Middle Sewer/Cafe Expansion 1.000m TOTAL 1.400m 2000-2001 COPS Additional Capital Outlay Request for 2001-2002 New Western K-8 (includes land) 18m Land Acquisition: West Middle & Harmony Replacement/Addition 2m Statesville High .525m TOTAL 20m Bus Garage Expansion 2.000m TOTAL 2.525m FUTURE BOND REFERENDUM ADR/Wayside Replacement (includes land and core for future expansion) Addition at Troutman Elementary (Cafeteria/Kitchen) Addition at Sharon Elementary (Cafeteria/Kitchen/Media/Sewer) Addition at Lake Norman Elementary (Multipurpose/Cafeteria Expansion/Classroom) Addition at Monticello Elementary (Cafeteria/Kitchen/Classroom) Addition at Ebenezer Elementary (Media/Classroom/Sewer) Addition at West High (Science Building/Auxiliary Gym) Addition at Statesville High (Science Building/Auxiliary Gym/Classroom) Addition at South Iredell High (Auxiliary Gym/Classroom) Addition at North Iredell High (Auxiliary Gym/Classroom) New Southern Elementary School Addition at Mt. Mourne (Cafeteria/Kitchen/Media/Classroom) Addition at Northview (Multipurpose Room/Cafeteria Expansion/Classroom) Additional Shepherd Elementary (Gym/Classroom) New Western High School Atkinson said the county could save money if the school system knew funding for Lakeshore Middle Phase Il was forthcoming. Blumenstein said that in 1993, the county was not allowed to proceed with the bond until an actual plan was in place. She added the 1993 COPS paid out in 2008 and the 1997 local bond paid out in 2017. Mr. Atkinson said the high school could be cloned from another county's design, e.g., Stokes County. The design plan could possibly be ready in three or four months. Staley said the school officials were asking for a commitment letter from the county so the Lakeshore Middle Phase 111111 site preparation work could begin. Blumenstein said the county could get a total bond amount together and then just issue one part. Later, the other part could be issued. Also, a direct placement loan could be done for Lakeshore Middle Phase II/1I1.