HomeMy WebLinkAboutC.054.93011_172312. Request for Approval of Sewer Bids in Conjunction with the Pratt Industries Project: Code Enforcement Director Lynn Niblock recommended that Gilbert Engineering be awarded the Pratt sewer bid at $305,500. He said the actual low bidder, Huffman Grading, failed to meet the required Minority Business Entrepreneur (MBE) requirements. Additionally, he said Gilbert Engineering's bid was initially over budget; however, the company had agreed to provide the work at the budgeted amount of $305,500. Niblock said Gilbert Engineering met all of the requirements, and the company could immediately begin the sewer construction. He said once completed, the City of Statesville would maintain the line. A summary of the bids is as follows: Contractor Bid Form Signed Bid Bond MBE Docs Total Bid Project Est. Funds Available $355,550.00 $ 305,500.00 State Utility Yes Yes Yes $481,336.80 125,786.80) 175,836.80 Huffman Grading Yes Yes No 315,013.60 40,536.40 (9,513.60) Buckeye Const. Yes Yes Yes 473,803.44 118,253.44 168,303.44 Fuller Contracting Yes Yes Yes 486,073.50 130,523.50 (180,573.50) Gilbert En ineerin Yes Yes I Yes 402,387.70 46,837.70 96,887.70 13. Request for Approval to Refect all Road Construction Bids in Conjunction with the Pratt Industries Project & to Re -Advertise: Code Enforcement Director Lynn Niblock said Huffman Grading at $431,285 had the lowest bid for the Pratt Road which was budgeted at $488,000. Niblock said, however, the State had a problem with Huff van's Minority Business Entrepreneur (MBE) paperwork. All other bidders were over the budgeted amount, and for this reason, Niblock requested rejection of all bids. (The project will be re -advertised.) A bid summary is as follows: Contractor Signed Bid Bond MBE Docs Total Bid Project Est. Funds Available $484,715.00 $488,000.00 Bell Construction WYes Yes Yes $674,900.00 190,185.00 186,900.00 Huffman Gradin Yes Yes $431,285.00 $53,430.00 $56,715.00 Insite Develo ment Yes Yes $493,000.00 8,285.00 $5,000.00J.T. Russell Yes Yes $568,893.84 84,178.84 80,893.84 The Martin ConTany I Yes Yes Yes 630,300.00 (145,585.00) (142,300.00 14. Request for Approval to Award the Pratt Industries Rail Spur Design Proposal to HDR Engineering Contingent Upon Review/Approval of the Contract by the County Attorney: Code Enforcement Director Lynn Niblock recommended HDR Engineering's proposal of $82,289.58 for the spur design. He offered two options for the work and suggested Option 2. Budgeted amount: Rail crossing Fund balance $902,500.00 235,632.10 $666,.867.90 Option #1 Original RR engineering cost $ 96,592.67 Fund balance 570,275.23 Funding left per track foot $ 211.21 Option #2 Fund balance S 666,867.90 *Modified RR Engineering Cost 82.289.58 Fund Balance $ 584,578.32 Funding left per track foot $ 216.51 *Modification: Monthly instead of weekly site visits and construction management support. 15. Request for Approval of a Grant Application for the 2008 EMS Toolkit Program: EMS Director David Cloer requested permission to apply for a $31,000 grant from the Duke Endowment/North Carolina Office of EMS. He said the purpose of the grant was to improve EMS response times, and the five areas that would be monitored were: dispatch time, turnaround time, enroute time, the vehicle 4