HomeMy WebLinkAboutC.054.93011_1655ZONING HISTORY: This property and surrounding properties have been zoned RA since the countywide zoning went into effect in 1990. GROWTH IMPACT: The following section analyzes the effects this development will have on the three major types of infrastructure schools, traffic/roads, water and sewer: 1. Schools. Students located in this development will attend Troutman Elementary an Miiddle and South Iredell High Schools. The capacity of each of these schools is listed below, along with the estimated impact that this development will have on each. School Capacin 2006/2007 Students Troutman Elementary 727 788 34 Troutman Middle 572 427 17 South Iredell High 1101 880 22 The school system is currently in the second phase of a three phase Capital Facilities Program. Under this program, the capacity of Troutman Elementary will increase to 800 (effective Summer 2007). The school system is also examining options for new elementary school locations in the general vicinity and options for the expansion and potential construction of a new middle school. If a school site is secured for the elementary, it will allow the school system to build a new school within the next two to three years. 2. Traffic/Roads. The estimated number of average daily trips per household is approximately ten. Based on the allowable density, this will equate to 2,240 trips at 224 lots and 3,330 trips at 333 lots. 3. Water and Sewer. The Town of Troutman will be providing water and sewer service to this development. A letter from the Town, labeled "Attachment A" is attached to this staff report. OTHER JURISDICTIONAL INFORMATION: This request has been reviewed, and endorsed, by the Town of Troutman. The Town has agreed to provide water and sewer service to the development. In return, the developer must agree to adhere to the development standards detailed in the letter from the Town of Troutman, dated June 20, 2007. STAFF COMMENTS: The recent growth study has established several new policies to consider when dealing with new development. This proposal is subject to much of that study due to the implications of the request for higher density development. Several core issues have been considered by the staff, and should be considered in your deliberation of this request. 1. Impact on schools. Higher density equals more children. The schools that will serve this development are either near, or over capacity. The developer currently has the right to develop on this property under the current RA zoning. By limiting the number of lots, the developer is agreeing to wait until the school system has had adequate time to plan for the new students. In this particular case, a new elementary/middle school combo is being planned that will serve this development. 2. Intergovernmental Cooperation. The Growth Study recommended that the County work closely with the municipalities to prepare for growth. The County Plarming Staff has worked closely with Troutman on this request and understands the Town's financial needs as they relate to water and sewer (see below). Because this request is endorsed by the Town, and is a prudent approach to development, we have tried to be as cooperative as possible with Troutman. 3. Urban Service Areas. The Growth Study recommended studying USAs as a way to cooperate with the municipalities and to funnel growth into areas that can handle it (i.e. water and sewer and roads). Although Troutman does not have an established USA, it does have a detailed Capital Improvement Plan for water and sewer. This area is currently served by these utilities, and would be included in the USA if it were adopted. 4. Water and Sewer Connectivity. It was apparent through the study that development with municipal utilities was preferred where possible. Because this area is served by utilities, it makes sense to connect. However, it also makes sense to allow higher densities when municipal utilities are available due to economic reasons, it benefits 29