HomeMy WebLinkAboutC.054.93011_1326Roofing
305,500.00
47,013.82
(50.000.00)
302,513.82
Boiler/HVAC
296,000.00
193,788.00
(40,000.00)
449,788.00
Mobile Set-uplLease
120,000.00
101,37938
(25,000.00)
196,379.38
Vehicles
858,000.00
43,922.30
(8,000.00)
893,92230
Paving 247,500.00 133,348.90 (75,000.00) 305,848.90
Waste Water 279,000.00 37,80636 (220,000.00) 96,80636
FurniturelEquipment 981,560.00 5,359.68 540,875.24 1,527 794.92
Total 5,123,850.00 641,58930 0.00 0.00 5,765,439.30
4. Request for Approval of Budget Amendment #14 for the Acceptance of a U.S.
Department of Justice Community Oriented Policing Services (COPS) Technology Grant
to be used for the Purchase of an Omnitrack Latent Print Station ($120,000 for equipment &
$28,000 for training): Mike Phillips, representing the sheriffs department, said this equipment
would aid in the Automated Fingerprint Identification System (AFIS).
5. Request from the Sheriffs Department for Permission to Apply for a Governor's
Crime Commission Gang Enforcement(Prevention Grant (up to $100,000): Mike Phillips,
representing the sheriffs department, requested permission to apply for this grant, and he said a
25% match could be derived from seized funds.
6. Request from the Sheriff for the Creation of a Crime Lab Supervisor Position (no
funding requested): Mike Phillips, representing the sheriffs department, said a lab supervisor
was needed to oversee the daily responsibilities of the lab and to provide hands-on involvement
in evidence analysis. He said lapsed salaries would be used to pay for the position, and any
additional costs would be taken from seized funds. (A memo from the sheriff indicated that the
current supervisor of the Criminal Investigation Division would be placed in the position and
would receive additional training. With approval of the new job title, a replacement will need to
be found for the supervisor of criminal investigation's position.
Phillips said the lab's fingerprint component would enable identification in "18 minutes
compared to the current time span of 18 months." He said the lab should be operational in 12
months and have four employees.
7. Request for Approval of Budget Amendment #15 for the Purpose of Using $36,000
in Seized Funds for Canine Replacements (1 Narcotics K-9; 1 Bomb Detection K-9 & the
Re -Training of two K -9s with new handlers): Mike Phillips, with the sheriffs department,
said a new narcotics canine was needed to replace an aging animal. He said another canine had
been transferred to the patrol division from the bomb detection squad, and this animal needed to
be replaced. Phillips said the Iredell-Statesville Schools would reimburse the sheriffs
department $15,000 for the new bomb detection canine. In addition, Phillips said funding was
needed for the retraining of two existing canines with new handlers.
8. Request for the Awarding of a Renovation Bid Contract for the Planning, Zoning
and Inspection Center (Low Bidder was Granger Construction with a base bid of $574,496
and with Alternate A-1 [painting] of $29,300 for a total of $603,796): Appearing before the
commissioners to explain this request were Purchasing Agent Dean Lail and Architect Chuck
Goode. Lail said a bid opening was held September 21 but an insufficient number of multi -
prime bids were received. He said due to the lack of multi -prime bidders, the bids were returned
unopened. Lail said five single prime bids were received, and all of them met the bid package
requirements. He said the low bidder was Granger Construction, and the staff recommended that
the bid be awarded to this company. A bid listing is as follows:
Granger Construction Base Bid $574,496.00, Alt A-1$29,300.00, Alt A-2 $ 37,000.00 120 days
Streamline LLC Base Bid $634,000.00, Alt A -I $30,000.00, Alt A-2 $140,000.00 150 days
Blue Ridge Enterprises Base Bid $658,000.00, Alt A-1$41,000.00, Alt A-2 $136,000.00 160 days
H.M. Kern Corp Base Bid $713,000.00, Alt A-1$29,000.00, Alt A-2 $132,000.00 240 days
FABCO Construction Base Bid $877,400.00, Alt A-1$45,345.00, Alt A-2 $148,653.00 180 days
(Alt A -I =painting of building exterior; Alt A-2=complete stripping of exterior of building)
Cn
u)
2�a2006(.0