HomeMy WebLinkAboutC.054.93011_1326Roofing 305,500.00 47,013.82 (50.000.00) 302,513.82 Boiler/HVAC 296,000.00 193,788.00 (40,000.00) 449,788.00 Mobile Set-uplLease 120,000.00 101,37938 (25,000.00) 196,379.38 Vehicles 858,000.00 43,922.30 (8,000.00) 893,92230 Paving 247,500.00 133,348.90 (75,000.00) 305,848.90 Waste Water 279,000.00 37,80636 (220,000.00) 96,80636 FurniturelEquipment 981,560.00 5,359.68 540,875.24 1,527 794.92 Total 5,123,850.00 641,58930 0.00 0.00 5,765,439.30 4. Request for Approval of Budget Amendment #14 for the Acceptance of a U.S. Department of Justice Community Oriented Policing Services (COPS) Technology Grant to be used for the Purchase of an Omnitrack Latent Print Station ($120,000 for equipment & $28,000 for training): Mike Phillips, representing the sheriffs department, said this equipment would aid in the Automated Fingerprint Identification System (AFIS). 5. Request from the Sheriffs Department for Permission to Apply for a Governor's Crime Commission Gang Enforcement(Prevention Grant (up to $100,000): Mike Phillips, representing the sheriffs department, requested permission to apply for this grant, and he said a 25% match could be derived from seized funds. 6. Request from the Sheriff for the Creation of a Crime Lab Supervisor Position (no funding requested): Mike Phillips, representing the sheriffs department, said a lab supervisor was needed to oversee the daily responsibilities of the lab and to provide hands-on involvement in evidence analysis. He said lapsed salaries would be used to pay for the position, and any additional costs would be taken from seized funds. (A memo from the sheriff indicated that the current supervisor of the Criminal Investigation Division would be placed in the position and would receive additional training. With approval of the new job title, a replacement will need to be found for the supervisor of criminal investigation's position. Phillips said the lab's fingerprint component would enable identification in "18 minutes compared to the current time span of 18 months." He said the lab should be operational in 12 months and have four employees. 7. Request for Approval of Budget Amendment #15 for the Purpose of Using $36,000 in Seized Funds for Canine Replacements (1 Narcotics K-9; 1 Bomb Detection K-9 & the Re -Training of two K -9s with new handlers): Mike Phillips, with the sheriffs department, said a new narcotics canine was needed to replace an aging animal. He said another canine had been transferred to the patrol division from the bomb detection squad, and this animal needed to be replaced. Phillips said the Iredell-Statesville Schools would reimburse the sheriffs department $15,000 for the new bomb detection canine. In addition, Phillips said funding was needed for the retraining of two existing canines with new handlers. 8. Request for the Awarding of a Renovation Bid Contract for the Planning, Zoning and Inspection Center (Low Bidder was Granger Construction with a base bid of $574,496 and with Alternate A-1 [painting] of $29,300 for a total of $603,796): Appearing before the commissioners to explain this request were Purchasing Agent Dean Lail and Architect Chuck Goode. Lail said a bid opening was held September 21 but an insufficient number of multi - prime bids were received. He said due to the lack of multi -prime bidders, the bids were returned unopened. Lail said five single prime bids were received, and all of them met the bid package requirements. He said the low bidder was Granger Construction, and the staff recommended that the bid be awarded to this company. A bid listing is as follows: Granger Construction Base Bid $574,496.00, Alt A-1$29,300.00, Alt A-2 $ 37,000.00 120 days Streamline LLC Base Bid $634,000.00, Alt A -I $30,000.00, Alt A-2 $140,000.00 150 days Blue Ridge Enterprises Base Bid $658,000.00, Alt A-1$41,000.00, Alt A-2 $136,000.00 160 days H.M. Kern Corp Base Bid $713,000.00, Alt A-1$29,000.00, Alt A-2 $132,000.00 240 days FABCO Construction Base Bid $877,400.00, Alt A-1$45,345.00, Alt A-2 $148,653.00 180 days (Alt A -I =painting of building exterior; Alt A-2=complete stripping of exterior of building) Cn u) 2�a2006(.0