HomeMy WebLinkAboutC.054.93011_0875B. The Planning Director shall present the materials submitted by the eweing entity
developer a eRg :t and the Geunty's inspection report and recommendations to the Board of
Conunissioners at its next retularly scheduled meeting
1. If the Board of Commissioners approves the inspection report and accepts the certification,
deed, and easements, the manning Direeter Board shall file said the deed and easements with the
Iredell County Register of Deeds, release up to seventy-five percent (75%) of the value of the surety
Performance bond or equivalent other security as sailed fef in Seefien 50:7 (F)(1) shall be made in
niameF as e .._a_., in Sest:.._ 507(F)(2) and 507X.(3` and issue a Watershed Protection
Occupancy Permit for the stormwater control structure, consistent with Section 310.
2. If deficiencies are found as a Fesuh of the inspection the Board of Commissioners shall
direct the owning entity to inalEe neeessaFy-Lhat improvements and inspections be made and/ or
documents corrected and resubmitted to the Board. No release ef fimds shall be made by th
C. No sooner than one year after
Geunty, the filing date of the deed, easements and maintenance agreement, the the
developer may petition the Board of Commissioners to release the remaining value of the pested performance
bond or other security salled. fef in Soutien Upon receipt of said petition, the County shall inspect
the stormwater control structure to determine whether the stme"e(s) controls is are performing as designed
and intended. Onee the insqieewa is niade, The Planning Director shall present the petition, inspection report,
and recommendations to the Board of Commissioners.
1. if the Board approves the retort and accepts the petition, the developer shall deposit
with the Board a cash amount equal to that described in Section 704(B)(2) after which, the Board
shall release the performance bond or other security.
2. If the Board does not accept the report and rejects the petition, the Board shall
provide the developer with instructions to correct any deficiencies and all steps necessary
for the release the performance bond or other security.
D. A An Watershed Protection Occupancy Permit shall not be issued for any s#uetute
building within the permitted development until the Board of Commissioners has approved the stormwater
control structure, as provided in Section 707(B) '
E. All stormwater control structures shall be inspected by the Gee" at least once on an
annual basis to determine whether the stmetwes controls are perfonrung as designed and intended. Records
of inspection shall be maintained on forms approved or supplied by the North Carolina Division of
Environmental Management. Annual inspections shall begin within one year-afierappreval-of filing date of
the deed for the stormwater control structure by the County Boafd of GeffiniissioneFs. A fee, in aeeefdanee
with a fee sehedule adopted by the BOaFd of Genvaissioners shall be ehafged te the owning entity feF amual
(and Fe inspeetions). A eopy of eash inspeetion felieFt Shall be filed with the Planning pimesm
In the event the Planning Director County's FepeFt discovers indiextes-the
need for corrective action or improvements, the Planning Director shall notify the
owning entity of the needed improvements and the date by which sueh imprevements
are the corrective action is to be completed. All improvements shall be made consistent
with the adopted—plans and specifications of the stormwater control structure and the
operation and -maintenance plan or manual
are made, After notification by the owning entity the Planning
Director and ask that an inspeetiea he made shall inspect and approve the completed
improvements. The Planning Director may consult with an engineer or landscape architect
(to the extent that the General Statutes, Chapter 89A, allow) designated by the Board of
Commissioners.
G. Appeals of any order, requirement, decision, or determination made by the Planning
Director may be made to and decided by the Board of Commissioners consistent with Section 502.
Section 708. Sanctions
In addition to the remedies described in Article 100 of this Ordinance and consistent with:
G.S. 153A-123, the Board of Commissioners may seek enforcement of this Ordinance through the
Board of Commissioners by assessing a civil penalty to be recovered by Iredell County in a civil
action in the nature of debt if the offender does not pay the penalty in a prescribed period of time after
being cited for violation of the ordinance. Said violation may be enforced by an appropriate equitable
remedy issuing from a court of competent jurisdiction. The court may issue an injunction and order of
abatement commanding the defendant to correct the unlawful condition upon or cease the unlawful
use of the property. The action shall be governed in all respects by the laws and rules governing civil
29