Loading...
HomeMy WebLinkAboutC.054.93011_0874A. A separate An operation and maintenance plan or manual roust shall be provided by the developer for each stormwater control structure, eentairung, at a nanitnumindicating-what operation and maintenance actions are needed and will be undeftaken, what specific quantitative criteria will be used for determining when those actions are to be taken and consistent with the Operation and Maintenance Agreement, who is responsible for st" those actions. The plan shall clearly indicate %4m the steps that will be taken for restoring a storrrtwater control structure to design specifications if a failure occurs. B. Landscaping and grounds management shall be the responsibility of the owning entity of said stiveture(s). However, vegetation shall not be established or allowed to mature to the extent that the integrity of the control structure is diminished or threatened, or to the extent of interfering with any easement or access to the stormwater control structure. C. Except for routine general landscaping and grounds ..,_: ,,.�.,teaaace management, the owning entity shall notify the Planning Bireeter Watershed Administrator prior to any repair or reconstruction of the stormwater control structure. All improvements shall be made consistent with the approval plans and specifications of the stormwater control fep4hat structure and the operation and maintenance plan or manual. After notification by the owning entity, County staff shall inspect the completed improvements and shall inform the owning entity of any required additions, changes, or modifications needed and of the time efriod to complete said improvements. A tune pef4ed feF inaking sueb ehanges shall also be sfiliulated by -the Gounty The Watershed Administrator may consult with an engineer or landscape architect (to the extent that the General Statutes Chapter 89A, allow) designated by the Board of Commissioners. A -fee; D. Amendments to the plans and of specifications of the stormwater control structure and/or the operation and maintenance plan or manual may -only shall be approved by the Board of Commissioners. Proposed changes shall be prepared by a North Carolina registered professional engineer or landscape architect (to the extent that the General Statutes Chapter 89A, allow) and submitted to and reviewed by the Watershed Administrator prior to the Board of Commissioners fef appFaval, gush Amendments shall . i by all 463Fniation and fees PFOSeribed in Seetion 507(C-) of this OFtluianee. App;eval of site aorpw�npmtr, shall not fequife Planning BeaFd Feview nof a new publie Writing, tagess eitheiz eF both afe 1. If the Board of Commissioners approves the proposed changes the owning entity of the stormwater control structure shall file sealed copies of the revisions with the Office of the Watershed Administrator. 2. if the Board of Commissioners disapproves the changes the proposal may be revised and resubmitted to the Board of Commissioners as a new proposal If the proposal has not been revised and is essentialiv the same as already reviewed it shall be returned to the applicant. E. If the Board of Commissioners fords that the operation and maintenance plan once -approved or manual is inadequate for any reason, the Planning *eeter Watershed Administrator shall notify the owning entity of any required changes mandated by the County and a time &aFne in whieh shanges to the Plan shall be made and shall prepare and file copies of the revised agreement with the Iredell County Register of Deeds the Office of the Watershed Administrator and the owning entity. Section 706. Application and Inspection Fees A. Processing and inspection fees shall be submitted in the form of a check or money order made payable i^ I_edeu Count, Applications shall be returned if not accompanied by the required fee. B. A permit and inspection fee schedule as approved by Iredell County Board of Commissioners, shall be posted in the Office of the Watershed Administrator. C. Inspection fees shall be valid for 60 days An inspection fee shall be required when improvements are made to the stormwater control structure consistent with Section 705(C), except in the case when a similar fee has been paid within the last 60 days. Section 707 Inspections and Release of the Performance Board A. AN new The stormwater control structure shall be inspected by the Geon ty Planning Director, after the owning entity notifies the Planning Director that all work has been completed. At this inspection, the owning entity shall provide: A The signed deed, related easements and survey plat for the stormwater control structure in ready for filing with the Register of Deeds; 2. A certification sealed by an engineer or landscape architect (to the extent a$ewed-by that the General Statutes, Chapter 89A, allow) stating that the stormwater control structure is complete and consistent with the approved plans and all -specifications previeusiy stipulated by the Germ 28