Loading...
HomeMy WebLinkAboutC.054.93011_0560identifies all work that we believe necessary to bring a building up to a level which we would consider very good to excellent condition. This level is maintained at each school so that all schools are as equal as possible. (An example of this would be lighting levels in classrooms.) Some portions of the work we recommend may already be on a schedule or within a budget to be done. We have found it best to identify all work we see is needed in our report. Any items which are already planned can be easily deducted from the cost we included. We also identify code issues which may be interpreted differently by others and therefore not enforced. If we believe an issue could result in an expense, we include that issue in our projected costs. The project costs included in the report that are used are all inclusive. All design fees, construction, testing, surveying, furniture, equipment, demolition, land, transitional space, and reasonably anticipated permits are included. The project costs have been escalated on projects that are anticipated to bid after December 2005. In 2004, construction costs increased at a much higher rate than the historical average. The global construction market and higher petroleum costs were the prime causes. The market remains unsettled to the point that we cannot predict with confidence how the construction costs will change during the duration of this program. The cost of Phase One is projected to be $116,893,129. The cost per school in Phase One is included as Page 3. A detailed breakdown of cost for each school is included in the final report dated February 15, 2005. This cost may be broken down into: New Construction $ 80,881,290 Renovations $ 9,166,731 Transitional Classrooms Renovations $ 1,610,000 Program Contingency $ 4,960,737 Non -Construction Costs $ 11,380,338 Land $ 4,700,000 Escalation $ 4.194, 033 TOTAL $116,893,129 One of the tasks we have during a facility study is to determine at what point do we recommend that a school be replaced rather than renovated and/or expanded. The most widely used method of this determination is the 70% Rule. The 70% Rule establishes that if the cost of renovations and additions exceeds 70% of the cost of a new school of the same size, it is more prudent to replace the school. For that reason, we recommend replacing Statesville High School, N.B. Mills Elementary School, and Mount Mourne Elementary School and utilizing the existing schools in alternative ways. N.B. MILLS ELEMENTARY SCHOOL $ 11, 794, 781 Combine with Monticello New Elementary School RenovationlAdditions costs exceeded the 70% rule. MOUNT MOURNE ELEMENTARY SCHOOL $ 11, 794, 781 New Elementary School Renovation/Additions costs exceeded the 70% rule. SHARON ELEMENTARY SCHOOL $ 5,830,601 General renovations and additions TROUTMAN ELEMENTARY SCHOOL $ 9,056,225 General renovations and additions