HomeMy WebLinkAboutC.054.93011_0426IREDELL COUNTY BOARD OF COMMISSIONERS SPECIAL MEETING MINUTES OCTOBER 11, 2004 The Iredell County Board of Commissioners met for a Special Meeting on Monday, October 11, 2004, 2:00 p.m., in the Iredell County Government Center (South Wing Conference Room), 200 South Center Street, Statesville, NC. Present were: Chairman Steve D. Johnson Vice Chairman Godfrey Williams Doug Madison Marvin Norman Sara Haire Tice Staff present: County Manager Joel Mashburn, Finance Director Susan Blumenstein, Support Services Director Jim Vernon, Social Services Director Don Wall, Income Maintenance Administrator Lynn Deal, Social Work Program Administrator Lisa York, and Clerk to the Board Jean Moore. Guests: Social Services Board Chairman William Jones and Social Services Board Member Bobbie Edmisten, along with media representatives also attended the meeting. CALL TO ORDER by Chairman Johnson. CONTINUED DISCUSSION REGARDING THE BIDS FOR THE NEW SOCIAL SERVICES BUILDING: Support Services Director Vernon said that since the October 5 board meeting, he along with the MBAJ architects, had met with the low bidders for the new social services building in an effort to identify some cost reductions. Vernon then described the following "value -engineered" items that could possibly be deleted from the project. General Construction: Textured (different finish, scoring) concrete instead of brick pavers at patio area. $ 3,150 Replace shaped GRG light cove in waiting area with plain gypsum board/metal stud soffit light cove. 4,300 Replace translucent ceiling panels in the second floor elevator lobby and main staircase with a flat ceiling of acoustical panel grid & tegular tile 2,160 Replace GRC cornice with brick. 36,500 Replace cast stone sills at the exterior with brick rowlock. 5,280 Provide vinyl wall covering without stain -resistant coating. 6,000 Use particle core wood door instead of structural composite lumber core doors. 2,700 Use 3/4" thick epoxy resin window sills instead of specified 1" thick epoxy resin window sills. 1,662 Delete drywall reveal trim at all locations shown on interior elevations (waiting 1101, elevator lobby 1030, 2030, corridor 1000). 7,776 $ 69,528 Plumbing: Use schedule 40 solid core PVC pipe instead of cast iron pipe for underground lines. $ 3,000 Mechanical: Provide plenum rated cable for control wiring instead of placing wiring in conduit in concealed spaces. $ 7,500 Provide finned tube boiler and approved stack instead of specified cast iron boiler and stack. 5 000 $ 12,500 Electrical: Use different manufacturer's light fixtures instead of manufacturers