Loading...
HomeMy WebLinkAboutC.054.93008_0106 (2)4093 We do not plan to use any of this money for new technology that is currently on the horizon. We do have on order a cat scanner which will arrive in November, but that's not part of this project. Campbell: One of the questions I get: We aren't getting any more beds, in fact, we are going to have less beds. Is that right? Nunnery: Not at Iredell Memorial. We have the same, the same number of beds. I think there are two parts to the answer here. One is, we would like to have 26 to 30 more beds. The Hamilton study recommended that Iredell Memorial have 26 more beds in the 1980 study. In April 1981, when we submitted a letter requesting an application for certificate of need for this project, we received a letter stating that the project would be automatically denied a certificate of need if it included any additional beds. Therefore, we decided to continue with our planning,_to continue to reassess, and to fight for the additional beds at a later time. We have submitted an application for certificate of need for eight additional beds. We submitted that application last week. We will add those eight beds, if we are permitted, we will add additional nursing units of approximately 30 beds if we can get the certificate of need approval for that, The building is designed to be able to add additional units, this is 30 -bed patient floors, without any disruption. There is a mechanical equipment penthouse which will separate the top floor of the current plans from any " further construction. So we do have built in the capability of acas 25 �,:,�