HomeMy WebLinkAboutC.054.93009_1303472 but if single -prime is done it is necessary to do multi -prime bids. Bids received were: White Fox Const.** Granite Falls, NC 1,515,731 NO BID (-) $10,288 G.L. Wilson Bldg.*** Statesville, NC 1,890,000 (+) $24,329 (-j $10,151 * Non responsive due to qualified bid ** Non responsive due to No Bid of Alternate No. 1 *** Non Responsive due to failure to acknowledge receipt of Addenda & qualified bid The low bid far exceeds the amount available for construction: Amount presented by Municipal as construction estimate: $1,246,415 Less: reduction by Board of Commissioners (100,000) Deduct: scales to be purchased outside of the construction contract (40,000) Amount approved for Lakeway Road (199,698) Engineering (latest estimate) (121.248) NET AVAILABLE FOR CONSTRUCTION S 785.469 Mr. Mashburn suggested that the five bids (all single -prime) be rejected and gave the following recommendations if the project is rebid: - Eliminate some concrete areas and use asphalt except in soma areas where trucks will have to start up. Eliminate paving and use gravel on areas that County vehicles will use. - Reduce the size of the scale house. Storage area could be eliminated and the County could possibly purchase a small storage building later. - Try to pull in the center area to reduce the amount of paving. Commissioner Boone asked why Municipal's estimates were so far off. Mr. Mashburn said he had asked Jim Woody; however, the engineering company is at a loss to explain the situation. Commissioner Boone reminded everyone that Municipal had made errors in the capping of the old landfill bids. This project had to also be re -bid. Commissioner Johnson said he was somewhat upset with the engineering company. Johnson referred to the cover letter that Municipal sent out explaining the bids. The letter indicated that the layout of the station was revised a number of times. Mr. 15 LUMP SUM DID ALTERNATE BID ALTERNATE NAME BASE BID NUMBER 1 NUMBER 2 Crowder Const. Indian Trail, NC $1,906,465 (-) $5,604 (-) $16,850 John S. Clark Mt Airy, NC NO BID Gilbert Eng. NO BID Statesville, NC Hall Contracting Charlotte, NC $1,962,100 (-) $20,270 (-) $ 6,850 Laughlin -Sutton* Browns Summit, NC 1,894,500 (-) $ 2,000 (-j $ 3,000 White Fox Const.** Granite Falls, NC 1,515,731 NO BID (-) $10,288 G.L. Wilson Bldg.*** Statesville, NC 1,890,000 (+) $24,329 (-j $10,151 * Non responsive due to qualified bid ** Non responsive due to No Bid of Alternate No. 1 *** Non Responsive due to failure to acknowledge receipt of Addenda & qualified bid The low bid far exceeds the amount available for construction: Amount presented by Municipal as construction estimate: $1,246,415 Less: reduction by Board of Commissioners (100,000) Deduct: scales to be purchased outside of the construction contract (40,000) Amount approved for Lakeway Road (199,698) Engineering (latest estimate) (121.248) NET AVAILABLE FOR CONSTRUCTION S 785.469 Mr. Mashburn suggested that the five bids (all single -prime) be rejected and gave the following recommendations if the project is rebid: - Eliminate some concrete areas and use asphalt except in soma areas where trucks will have to start up. Eliminate paving and use gravel on areas that County vehicles will use. - Reduce the size of the scale house. Storage area could be eliminated and the County could possibly purchase a small storage building later. - Try to pull in the center area to reduce the amount of paving. Commissioner Boone asked why Municipal's estimates were so far off. Mr. Mashburn said he had asked Jim Woody; however, the engineering company is at a loss to explain the situation. Commissioner Boone reminded everyone that Municipal had made errors in the capping of the old landfill bids. This project had to also be re -bid. Commissioner Johnson said he was somewhat upset with the engineering company. Johnson referred to the cover letter that Municipal sent out explaining the bids. The letter indicated that the layout of the station was revised a number of times. Mr. 15