Loading...
HomeMy WebLinkAboutC.054.93009_0770 (2)whether or not they will provide services. They have asked their consulting engineers, Willis Engineering Company, to evaluate the demands on the line. Brolin feels optimistic about the sewage service with Mooresville. Commissioner Johnson asked about the time frame on the project. Brolin said the cost of the sewer will be borne by the private developer. Mooresville's policy is that if the lines are extended, Mooresville will take it over. Brolin said Thomas Wilson Properties is willing to "foot the bill." He pointed out some other development that is taking place in the area that would be served by the sewer line and they have indicated a willingness to help bear some of the cost of extending the line. Wanda Young. The time frame is to get started on the closest corner, which is the residential office, sometime in late summer. It depends upon how soon they can get the sewer. They have a back- up plan besides the City of Mooresville. They will have to have sewer. The prospect of getting water along with the sewer from the Town of Mooresville makes the plan of getting the services from the Town of Mooresville the most feasible plan, Young said. Chairman Haire asked for other questions and/or comments. There were none. Chairman Haire closed the public hearing. MRs. A. P. MORRISON EEIRS (TRhD O. MORRISON, EXECUTOR OF ESTATE) PROPERTY, CASE 39411-4: MOTION from Commissioner Madison to approve the rezoning as requested and recommended by the planning board with one additional Conditional Use being placed on the property, and that being the placement of a 100' buffer on the south side of the property, which the developers have said they would accept, and also the other conditional used on the GB CUD, which are: The following uses are being excluded: bottling works bus repair and storage terminals mobile home display lots trucking terminals, transfer companies wholesale storage of gasoline and oil products (including bottled gas and oxygen) circuses and carnivals, on a temporary basis, not to exceed seven (7) days dairy products processing and distributing facilities feed and seed stores freezer lockers and ice plans public works and public utility facilities, including service and storage yards tire recapping shops vending companies Substitute MOTION from Commissioner Boone that an additional condition in the GB CUD zone be that any race shops have restrictive covenants that will provide reasonable noise abatement measures, and that any open garage doors be turned so as to face away from the border of the property. Secondly, that the proposed R -O zone be R-0 CUD, the condition being that there not be in excess of 120 dwelling units built in that area. Commissioner Madison said he would incorporate the substitute motion as a part of his motion. This property is located at the southeast corner of NC Highway 15OW and McCrary Road, more specifically identified as Lot 1, Block C, of Iredell County Tax Map 2P. VOTING: Ayes - 5; Nays - 0. JAN 3190'9 751