HomeMy WebLinkAboutC.054.93009_1009IREDELL COUNTY BOARD OF COMMISSIONERS
BRIEFING MINUTES
AUGUST + +995
e well County Board of Commissioners met in Bri ing
Session in the Commissioners' Meeting Room, Iredell C my
Gov nm t Center, 200 South Center Street, Statesville, NC. hose
present r the meeting were:
Sara K. Haire Chairman
David A. Boone, ice Chairman
Stephen D Johnson
C. Douglas adison, Jr.
Alice Stewart
Others present: \
Joel
CALL TO ORDER:
The county
to serve as the
Mrs. Workman pro
for nine years.
I
n, County Manager
z Clerk to the Board
Director of Servi
well, Purchasing Dire
octor, Sheriff's Depa
le, Sheriff's Departm
burn, Health Directol
afuss, Nursing Direlf
Haire
educed Wendy 1
ve`,assistant
ad at the Coc
Duncan, Mr. John ill, and M Gr g F
two proposals ey have dev ope f
renovation. Th designs presen d k
with an effort sing made to ha as n
lowest costs. Mr. Pumphrey, th co ar
had tiliZedA solid wall and so
Scheme Xar
a kitchen area and k
resmahe booking area and 1
medicalwould be developed. eoutsideising area could b u
proposars 184 beds (22-fe 1 ; 0
96-malesolation). The b ea do
ork
16,500 S.F. New Cons r tion
3,500 S.F. Renovat xisting
Total Estimat robable
Development
or a w/0,000
as been hired
i t e mer's office
a eve nsion Offi
: Mr. ohn
y briethe gr on
he jaixpanse and ,
the latin tec ology
beds as ible th the
s archi, st ed they,
approac
area in p sent jail
rt wouldlarged. A
ice currused for an
r futurension. This
uvenile;ork release;
pr estimcosts is:
$ 0002,200
Sch24e B: The kitchen an b oking area woe
kitchen being enlarged. deliveries w
area4. Inmates would be ought into boot
The,+public would be in a olated section.
look into all male dor nd into the exe:
Sitework
18,000 S.F. N Construction
3,600 S.F. ovated Existinc
Total imated Probable
The dorm beds are , enly divided, the
smaller component (40 is the maxi
quadrant; howeve , 32 is the max
proposals. Both/schemes are for a o
Gaston County has approved a pre-.cas
begin on August 2, 1995, and it shou d
months. '
Is reversed with the
occur in a secured
in a private area.
control room would
area.
$ 60,000
$ , 4,400
�-�l�evel
could kis br en down into
amounto inmates per
m considere for these
facility
facility. Constr tion will
be completed in fo or five