HomeMy WebLinkAboutC.054.93010_1197IREDELL COUNTY
ENERGY UNITED WATER CORPORATION
WEST FARM DEVELOPMENT PROJECT
CONTRACT B: 1,000,000 GALLON ELEVATED WATER STORAGE TANK
BID TABULATION
hoenix Fabricators
Caldwell Tanks
CII&I Constructors
Avon, Indiana
Louisville, KY
Alpharetta, GA
Base Bid(reauLump
sum
$961,000.00
$994,376.00
$1,261,000.00
1,000,000 Gallovated
Water Storage
Complete 360 d
A►ternateBidired)
Lump Sum
$739,470.00$820,19300
$1,097,000.00750,000
GallontedWater
CJ----$994,316
Storage
Co lete 360
lternaLump
sum
No bid
Nobid
No bid
tion1,000,000
GallvatedWater
Storage
Co tete 270
Alternate Bid o.
Lump sum
No bid
No bid
No bid
(optional)
750,000 Gallon Elevated
Water Storage Tank,
Co lete — 270 it s
Alternate BidNo.4
Lump sum
No bid
$1,160,135.00
$1,061,000.00
(optional)
1,000,000 Gallon Fluted
Column Style Elevated
Water Storage Tank —
Complete 360 days
Alternate Bid No. 5
Lump Sum
No Bid
$966,401.00
$897,000.00
o tional
750,000 Gallon Fluted
Column Style Elevated
Water Storage Tank,
Complete — 360 days
Alternate Bid No. 6
Lump Sum
No bid
No bid
No bid
(optional
1,000,000 Gallon Fluted
Column Style Elevated
Water Storage Tank,
Co tete — 270 days
Alternate Bid No. 7
Lump sum
No bid
No bid
No bid
(optional
750,000 Gallon Fluted
Column Style Elevated
Water Storage Tank,
Complete — 270 days
Instrumentation and
Controls
Lump sum
$17,500.00
$12,500.00
$9,700.00
Base Bid (required
Alternate Bid No. 1
Lump sum
$16,660.00
$9,800.00
$8,900.00
r ired
Dexter-Fortson Equipment
Benjamin Thomas, an engineer with West Consultants, Inc., recommended that the low
bid of $961,000 from Phoenix Fabricators & Erectors, Inc. (182 South County Road 900 East,
Avon, Indiana 46123) be selected.
Memorandum of Understandine
Regarding the Funding of Contingency Costs for the Millard Refrigerated Services/
West Farm Water Tank Project
The water tank project has funding of $1,080,000 and the low bid amount for the project
is $961,000, excluding instrumentation and controls (telemetry). Additional costs are the
engineering, surveying, and inspection fees of $87,310 and the CDBG administration fee of