Loading...
HomeMy WebLinkAboutC.054.93010_1170Library Director Steve Messick said the architect had completed the lower level specifications and plans. He said the main level would not he altered that much, and it was basically an open area. OT[ON by Commissioner Williams to proceed with the multi -prime construction bid method for a total cost of $3,823,547 using the low bidders of B.H Bryan Construction (general contractor @ $2,721,329) Duncan Electrical, Inc., (electrical contractor @ $334,200) William C. Reynolds (mechanical contractor @ $638,118) and Cajah's Mountain Plumbing (plumbing contractor (Ii, $129,900) with an understanding that Alternates 1 and 2 should be included in the work and to authorize permission for the staff to pursue and negotiate further upgrades. VOTING: Ayes - 4; Nays - 0. The bids in their entirety are as follows. IULTI PRIME SEPARATE - GENERAL Contractor ADDENDA Addenda Base nRc to Abemate 1 2 Unit Prices --� Beco X X X Bid 1 2 Taal lhtsoit. Ficvator Rock Rack Duncan X X X soil lack Hole General Trenches All Fowler X X (CY) (LF) 399,000 7,300 Alternates 1 2 3 4 5 NC BH Bryan X X X X X $2,544,181 $149,838 $27,310 $20.00 $55.00 $60.00 $80,00 $2,721,329 Statesville, NC Lake X X X X 346,000 6,474 352,474 Progress X X X X Choate Const. 8,200 342,200 Mooresville, NC Salem Electric X X X X 357,400 3,700 361,100 Winston-Salem,NC Company, Inc Eastern Summit Const. Co., Inc. Edison Foard, Inc. X X X X X 2,78R,000 179,600 20,900 11.00 250.00 75.00 100.00 2,988,500 Charlotte, NC - Farley Associates, Inc G.L.WilsonBoilding X X X X X 2,945,000 230,000 30,000 8.00 10.00 25.00 50.00 3,205,000 Statesville, NC Hendrix & Comher X X X X X 3,552,600 232,614 3,785,214 Mocksville, NC 2,775,000 230,000 20,000 14.00 175.00 100.00 125.00 3,025,000 Lyon Construction X X X X X Winston-Salem, NC Moss -Marlow Bldg. X X X X X 2,810,000 260,000 _ 21,400 9.00 1.60 28.00 55.00 3,091,400 Hicko , NC _ - '- Sossamon Construction Co. Stredvey X X X X X 3,077,000 1-52,000 29,900 9.65 210.00 45.00 75.00 3,258,900 Construction Raleigh, NC Triangle Contractors, Inc. 2,710,000 153,000 21,300 12.00 250.00 53.00 90.00 2,884,300 Wagoner X X X X X Construction Salisbury, NC m■ 001AAc 1cr7oA0ATFI FI.RCTRICAI Contractor •s ADDENDA v VBase Bid Altemate No. 1 Total (All Aternates) 1 2 3 4 5 Beco X X X X $387,500 $6,600 $394,100 Elkin, NC Duncan X X X X 327,500 6,700 334,200 N.Wilkesboro, NC Fowler X X X X 399,000 7,300 406,300 Southern Pines, NC Keller X X X X 332,425 6,000 338.425 N.Wilkesboro, NC Lake X X X X 346,000 6,474 352,474 Progress X X X X 334,000 8,200 342,200 Mooresville, NC Salem Electric X X X X 357,400 3,700 361,100 Winston-Salem,NC