Loading...
HomeMy WebLinkAboutC.054.93011_1432 (2)RESOLUTION IN SUPPPORT OF RECOMMENDATIONS MADE BY THE HOUSE SELECT COMMITTEE ON PUBLIC SCHOOL CONSTRUCTION FUNDING PRESENTED TO THE GENERAL ASSEMBLY ON JANUARY 24, 2007 WITH REVENUES DISTRIBUTED ON AN ADM BASIS WHEREAS, providing a better and safer learning environment for our children is a pressing need in the State of North Carolina, and in Iredell County; and WHEREAS, over the next five years, North Carolina faces over $9.9 billion in school construction needs, and Iredell County faces $149,000,000 in school construction needs; and WHEREAS, class size reduction from North Carolina and federal initiatives require commensurate space at existing public school facilities, and North Carolina Public Schools have made space for North Carolina's expansion of More at Four and Smart Start pre -Kindergarten, and Federal mandates from the No Child Left Behind (NCLB) Act and Individuals with Disabilities Education Act (IDEA) for individual and small group instruction thereby placing additional burdens on North Carolina's public school facilities; and WHEREAS, inadequate facility funding and explosive student growth prohibits North Carolina Public Schools from providing adequate classroom space, resulting in the use of mobile units and deteriorating facilities that pose health and safety hazards for students and personnel, leaking roofs, antiquated ventilation, and cramped classrooms, without sufficient funding for replacement and/or repairs; and WHEREAS, the Iredell-Statesville School System is currently using 62 mobile units (190 classrooms); and WHEREAS, public school construction costs have increased by 47% since 2000 which continues to increase along with public school facility needs; and WHEREAS, a statewide school bond referendum is an investment in public school facilities that will provide replacement or repair of deteriorating buildings, accommodate student growth, decrease the need for mobile units, retrofit school facilities for 21' century technologies, improve working conditions for teachers to help address North Carolina's teacher shortage, and provide a safe learning environment for North Carolina's students. NOW, THEREFORE, IT IS HEREBY RESOLVED THAT THE: Iredell County Board of Commissioners adopts this Resolution in support of the recommendations made by the House Select Committee on Public School Construction Funding as presented to the General Assembly on January 24, 2007, with revenues distributed on an ADM basis. It is further resolved and ordered that a copy of this Resolution be sent to The Honorable Michael F. Easley, Governor of North Carolina, Dr. June St. Clair Atkinson, the Superintendent of Public Instruction, the current members of the North Carolina General Assembly, and the North Carolina State Board of Education. This, the 20th day of February, 2007. 2. Request for Approval of the January 2007 Refunds and Releases: Tax Administrator Bill Doolittle requested approval of the following refunds and releases. He mentioned that year 2007 tax notices would be mailed to property owners on March 20. JANUARY 2007 TAX RELEASES & REFUNDS Releases Refunds County $18,339.65 1,251.01 Solid Waste Fees 1,027.00 0 East Alexander Co. Fire #1 0 0 Fire # 2 80.42 15.52 -Shepherd's Mount Mourne Fire # 3 24.68 37.33 All County Fire # 4 1,045.67 788.09 Statesville City 1,098.34 860.70 Statesville Downtown 23.22 0 Mooresville Town 7,197.61 169.55 Mooresville Downtown 0 0 Mooresville School 1,178.99 44.50