Loading...
HomeMy WebLinkAboutC.054.93011_1421 (2)•Issues mentioned by the public included, increase of road and lake traffic, no other mannas were located in a cove, decrease in value of homes in the area, noise, rental business, storage tanks, and that it was not consistent with land use plan. -Application was withdrawn May 21, 1996. August 2001 — Board of Commissioners o Request to rezone property for RR to GB (CUD) and amend the Iredell County Land Use Plan. o A petition with over 100 names was submitted in favor of this request. o A petition with approximately 100 names was submitted in opposition to this request. o The request was approved August of 2001 with the following conditions: a. Request shall be limited to a dock -building facility only with continued usage of the boat slips by the proposed operation. b. The development shall adhere to the Site Specific Plan. C. All loading and equipment/storage yards shall be located only on the western part of the tract, as per the site plan. d. All outside storage shall be screened to 90% opaqueness to a height of eight feet (this should be done with either a solid fence, vegetation, earth berm, or a combination). e. The outside storage must be screened in a way that would not allow different elevations to see inside the fence, i.e, if someone were located on a higher elevation overlooking the site, the storage would have to be hidden so that it would not have a detrimental effect on the neighbor. f If metal is designated as the primary building material, the frontage and lake side should have architectural treatments such as a fagade. All new buildings on the property shall be in general conformity with the primary building, i.e, materials, architectural treatments, etc. g. All fabrication shall take place inside a building or within the screened "yard." h. Only assembly of pre -fabricated sections may take place on the water. This type of assembly shall be limited to sections that must be immediately put into the water for assembly and/or transport. i. A letter of approval/recommendation from the Lake Norman Marine Commission and Duke Power shall be required. j. Lighting should be oriented away from the adjacent residential property owners, including those across the cove. The primary cone of illumination shall not create a glare off of the lake and shall not affect adjacent property owners or owners across the lake either directly or indirectly. k. New signage shall be limited to that permitted in the Office and Institutional District (60 square feet total with a 24 -foot total for freestanding signs). 1. Hours of operation (8-5 weekdays). in. All forklifts or heavy equipment would have to be "muffled" and the noise limited. n. No overnight stays shall be permitted on any boats docked in any approved slips. o. One slip shall be designated for usage by the Iredell County Sheriffs Department. p. The slips/docks shall be gated and locked when not in use. q. The slips/docks shall be cleared of people thirty minutes after sunset. February 2003 — Board of Commissioners o Request to modify conditions of the previously approved GB (CUD) request approved in August of 2001 to add a charter boat service. o No opposition was present at either the Planning Board or County Commissioners meetings. o The following conditions were approved February of 2003 and added to the GB (CUD): a) Routes of operation — Lake Norman b) Passenger capacity — 35 c) Boat Size — 14' x 56' d) Noise level — minimal e) Hours of operation — when charters are reserved f) Frequency of operation — when charters are reserved g) Proximity (distance from) to the shoreline while in operation — 150' from dock or shoreline h) Sewage disposal and method of disposal — pump out at Blue Parrott or Queens Landing or mobile unit from Maggie Ann's Marina i) On shore supporting facilities — existing building or boardwalk area January 2007 — Planning Board o The current request is to modify the existing GB (CUD) to remove most of the stated uses and conditions and to replace them with the following for Case # 0701-4: