Loading...
HomeMy WebLinkAboutC.054.93010_1026was built to hold 201. Dowdle said the former prison site could hold 92 inmates, and the state was still reviewing the lease documents. Mashburn said the county had been working with an engineer (John Garland) on the sewer system for the site. He said all of the sewer options would be expensive ($750,000 to $1 million). UPDATE ON THE REFUNDING OF THE 2000 INSTALLMENT PAYMENT NOTE: Finance Director Blumenstein said it appeared the bond refunding would save approximately $1 million over the life of the bonds. She said the closing for the documents was scheduled for February 20 and 21 in Charlotte. ADJOURNMENT: Chairman Johnson adjourned the briefing session at 6:25 p.m. APPROVED:���2"u� / ' Clerk to the Board