HomeMy WebLinkAboutC.054.93011_0559 (2)IREDELL COUNTY BOARD OF COMMISSIONERS
MINUTES FOR THE JOINT MEETING BETWEEN THE IREDELL COUNTY
BOARD OF COMMISSIONERS AND THE IREDELL-STATESVILLE
BOARD OF EDUCATION
FEBRUARY 15, 2005
The Iredell County Board of Commissioners met with the Iredell-Statesville
Board of Education on Tuesday, February 15, 2005, at 5:00 p.m., in the Iredell County
Government Center (South Wing Conference Room), 200 South Center Street,
Statesville, NC.
Iredell County Commissioners Present were:
Chairman Sara Haire Tice
Vice Chairman Godfrey Williams
Steve D. Johnson
Marvin Norman
Ken Robertson
County Staff present: County Manager Joel Mashburn, Finance Director Susan
Blumenstein, Support Services Director Jim Vernon, and Clerk to the Board Jean
Moore.
Board of Education Members Present were:
Dr. David Cash, Chairman
Tara Cashion, Vice Chairman
Jim Head
Charles Kelly
David Parker
Keith Williams
School Staff present: Superintendent Dr. Terry Holliday, Deputy Supt. Dr.
Steve Lane, Dr. Kenny Miller, and Construction Manager Rob Jackson.
Chairman Tice called the board of commissioners to order, and Chairman Cash
called the school board to order.
Presentation of the Phase One Facility Study: Ed Watson, the Vice President
of the Construction Control Corporation, provided an overview of the Phase One study,
and a copy of his executive summary is as follows:
IREDELL-STA TESVILLE SCHOOLS/IREDELL COUNTY
FACILITY SURVEY PHASE ONE
EXECUTIVE SUMMARY
(Revised)
Construction Control Corporation has completed Phase One of the Facility Study as
authorized by Iredell-Statesville Schools and Iredell County.
The study included inspections at each of the twelve facilities included in Phase One,
discussions with school and maintenance personnel, reviews of maintenance
information, a review of the ISS Classroom Analysis for Proposed Facility Plan, and
the Joint Task Force Long Range Facility Plan. These plans utilized the North
Carolina Public Schools Facilities Guidelines to determine new construction space
requirements. The personnel from Construction Control Corporation included one
person specializing in architectural/structural/civil areas and one person specializing
in the plumbing, HVAC, and electrical areas. The years of experience of these men
exceed 55 years in total.
Our review included evaluations of the following: Life Safety issues, ADA issues,
overall building condition from a physical standpoint (structural, roofing, plumbing,
mechanical, electrical, finishes, and building envelope), and site issues. Our review