HomeMy WebLinkAboutC.054.93010_0661Alternate No. 1: Amount to be deducted from the Base Bid to eliminate the entrance
additions (415,700).
Alternate No. 2: Amount to be deducted from the base bid to eliminate the counter
at work area 105. (This alternate was not used.)
Alternate No. 3: Amount to be deducted from the base bid to eliminate the counter and
swing gate at vital area 112. (This alternate was not used.)
Alternate No. 4: Amount to increase the base bid to repaint all exterior CMU with
Benjamin Moore "Off White 105-1 A," (+$4,800)
*Streamline's bid of $377,105 was reduced by $15,700 using alternate # 1 and eliminating
the entrance additions. Also, the bid amount then ($361,405) was increased by adding
alternate #4 (repainting of exterior) in the amount of $4,800 to arrive at the $366,205
(general construction amount used in the project ordinance).
The amended Capital Project Ordinance is now as follows:
Iredell County, North Carolina
Amended Capital Project Ordinance
Hall of Justice Annex
Note: There is no change in the total dollars budgeted. This amendwent allocates costs between separate
contracts.
Be it Ordained by the Board of County Commissioners of Iredell County, North Carolina:
Section 1. The following costs of the design, renovation, and furnishing of the Hall of Justice Annex
(formerly Iredell Agricultural Center) shall be financed by this find:
Design & Engineering 42,000
General Construction 366,205
Plumbing 33,500
Mechanical 109,625
Electrical 64,630
Furniture & Equipment 138.440
Section 2. Funds for this Capital Project Fund will be provided from the following source:
Transfers from Capital Reserve Fund $
Section 3. This Capital Project Fund shall continue until the project is complete.
Section 4. Payments from this Capital Project Fund shall be authorized by the County Manager or his
designee.
Section 5. Upon completion of the construction project all funds remaining in this Capital Project Fund
will be transferred back to the Capital Reserve Fund.
A complete summary, of all bids received, is as follows:
Separate Prime General Contract
Streamline
W.G. Holden
Brooks GC
Wilkie Const.
BH Bryan
Time
145
150
150
180
150
Base Bid $ 377,105
$ 426,588
$ 479,453
$ 468,816
$ 390,070
Alt, I
- 15,700
- 14,136
24,000
22,200
9,400
Alt.2
2000
925
1,500
925
925
Alt.3
1000
875
1,300
875
875
Alt.4
+ 4800
+ 5,220
+ 5,200
+ 4,800
+ 9,987
Note: No bids received from American Construction, Walker Construction, Mullet Construction,
and Donald Neal Construction.