Loading...
HomeMy WebLinkAboutC.054.93011_0233 (2)of Thermoforming Operations for WinCup, along with Carol Parrott, the Controller, also attended the meeting. Towne said WinCup desired to invest $40 million in the county, over two years, and hire 102 employees. He said 52 employees had already been hired. No one else desired to speak, and Chairman Johnson adjourned the hearing. OTIO by Commissioner Tice to approve an economic development incentive for WinCup Holdings in the amount of $139,200.00, over a six-year period, based upon a $40 million investment in Iredell County. VOTING: Ayes — 5; Nays — 0. Chairman Johnson declared the meeting to be in a public hearing. Consideration of the 2004-2005 North Carolina Department of Transportation's (DOT) Secondary Road Construction Program: Clay Lunsford (DOT District Engineer), Joe Lamb (DOT Division Maintenance Engineer), Mark Taylor (DOT Assistant District Engineer) and Patrick Norman (County Maintenance Engineer) were in attendance to present the 2004-05 Secondary Road Construction Program. Lunsford said the anticipated allocation for the program was 52,356,061.00, and this was from the highway fund ($1,623,257.00) and the trust fund ($732,804.00). Mr. Lunsford then described the following priorities. Rural Paving Priority Programmed Paving Goal: 7.73 miles Priority # SR # Length Miles Road Name/ Est. Cost Description 9F* SR 1831 1.11 Troy Mill Road from SR -1821 to SR -1813 $250,000.00 10F* SR 2376 0.5 Dunwoody Road from SR -2375 to dead $120,000.00 end 11 SR 1909 1.48 Yadkin Valley Road from NC -115 to SR — $340,000.00 1908 12 SR 1872S 0.94 Grant Road from SR -2017 to SR -1898 $215,000.00 13 SR 2114 1.80 Reavis Road from SR -2115 to SR -2105 $400,000.00 Total Miles 5.83 (*F means frozen from the previous priority ratings) Rural Paving Alternates Subtotal $1.325,000.00 Priority # SR # Length Miles Road Name/ Description Est. Cost 14 SR 1604 11.20 1 Oak Hollow Road $260,000.00 Subdivision Paving Priority Priority # SR # Length Miles Road Name/ Description Est. Cost 24 SR 1298 0.33 Bow Lane from SR -1148 to dead end $72,600.00 25 SR 1486 0.04 Spring Garden from SR -1481 to dead end $ 8,800.00 26 SR 2710 0.25 Denion Road from SR -1323 to dead end $55,000.00 27 SR 1398 0.24 Kenway Loop from end of pavement to pavement $52,800.00 28 SR 1361S 0.18 B Street from SR -1617 to dead end $39,600.00 29 SR 1412 0.06 8` Street from SR -1413 to SR -1390 $13,200.00 30 SR 1398S 0.30 Kenway Loop from end of pavement to pavement $66,000.00 P.O.P* Addition to System 0.50 Sunsteade Drive from SR -3006 to dead end $130,000.00 Total Miles 1.90 Subtotal $438.000.00 (*Property Owners Participation)