HomeMy WebLinkAboutC.054.93011_0233 (2)of Thermoforming Operations for WinCup, along with Carol Parrott, the Controller, also
attended the meeting. Towne said WinCup desired to invest $40 million in the county, over two
years, and hire 102 employees. He said 52 employees had already been hired.
No one else desired to speak, and Chairman Johnson adjourned the hearing.
OTIO by Commissioner Tice to approve an economic development incentive for
WinCup Holdings in the amount of $139,200.00, over a six-year period, based upon a $40
million investment in Iredell County.
VOTING: Ayes — 5; Nays — 0.
Chairman Johnson declared the meeting to be in a public hearing.
Consideration of the 2004-2005 North Carolina Department of Transportation's
(DOT) Secondary Road Construction Program: Clay Lunsford (DOT District Engineer), Joe
Lamb (DOT Division Maintenance Engineer), Mark Taylor (DOT Assistant District Engineer)
and Patrick Norman (County Maintenance Engineer) were in attendance to present the 2004-05
Secondary Road Construction Program. Lunsford said the anticipated allocation for the program
was 52,356,061.00, and this was from the highway fund ($1,623,257.00) and the trust fund
($732,804.00). Mr. Lunsford then described the following priorities.
Rural Paving Priority Programmed Paving Goal: 7.73 miles
Priority #
SR #
Length
Miles
Road Name/ Est. Cost
Description
9F*
SR 1831
1.11
Troy Mill Road from SR -1821 to SR -1813 $250,000.00
10F*
SR 2376
0.5
Dunwoody Road from SR -2375 to dead $120,000.00
end
11
SR 1909
1.48
Yadkin Valley Road from NC -115 to SR — $340,000.00
1908
12
SR 1872S
0.94
Grant Road from SR -2017 to SR -1898 $215,000.00
13
SR 2114
1.80
Reavis Road from SR -2115 to SR -2105 $400,000.00
Total Miles 5.83
(*F means frozen from the previous priority ratings)
Rural Paving Alternates
Subtotal $1.325,000.00
Priority # SR #
Length
Miles
Road Name/
Description
Est. Cost
14 SR 1604
11.20
1 Oak Hollow Road
$260,000.00
Subdivision Paving Priority
Priority #
SR #
Length
Miles
Road Name/
Description
Est. Cost
24
SR 1298
0.33
Bow Lane from SR -1148 to dead end
$72,600.00
25
SR 1486
0.04
Spring Garden from SR -1481 to dead end
$ 8,800.00
26
SR 2710
0.25
Denion Road from SR -1323 to dead end
$55,000.00
27
SR 1398
0.24
Kenway Loop from end of pavement to
pavement
$52,800.00
28
SR 1361S
0.18
B Street from SR -1617 to dead end
$39,600.00
29
SR 1412
0.06
8` Street from SR -1413 to SR -1390
$13,200.00
30
SR 1398S
0.30
Kenway Loop from end of pavement to
pavement
$66,000.00
P.O.P*
Addition
to System
0.50
Sunsteade Drive from SR -3006 to dead
end
$130,000.00
Total Miles 1.90 Subtotal $438.000.00
(*Property Owners Participation)