HomeMy WebLinkAboutC.054.93010_06275. That the owner of the structure and property known as the Albert Hill Setzer House be given notice
of this ordinance as required by applicable law and copies of this ordinance be filed and indexed in the Offices
of the County Clerk, Iredell County Register of Deeds, Building Inspections Department, and County Assessor,
as required by applicable law.
ADMINISTRATIVE MATTERS
Announcement of Dates for the Board Members to Visit Public Library Facilities Designed by
Architectural Firms being Considered for Iredell County's New Library: Chairman Tice announced that
the board members would travel to the following destinations to visit two library facilities.
Saturday, January 12, 2002 - Lexington County Main Library, located in Lexington, South Carolina, designed
by Craig Gaulden Davis.
Saturday, January 26, 2002 - Catawba County Library (Patrick Beaver Memorial Library), located in
Hickory, NC, designed by Calloway Johnson Moore West.
Discussion/Approval of the American Institute of Architects (AIA) Contract with MBAJ
Architecture for the Design Work on the Iredell County Government Center -South: Support Services
Director Jim Vernon, during the briefing session, distributed the following statement of probable costs
concerning the renovation of the former hospital facility located in Mooresville, NC.
Iredell County Government Center- South
Statement of Probable Cost
Total Project
Sitework:
Assumption for sally -port
$15,000
Loading dock/judges exterior security
15,000
Sub -Total
$30,000
Building First Floor Renovations
Square Footage $/SF
New Courts Facility 7450 $55
409,750
ProbationTarole Offices 4160 30
124,800
Sheriff Dept, Offices 1870 30
56,100
Health Dept. 6150 30
184,500
Mentalllealth 3500 30
105,000
VA 450 30
13,500
Commons/circulation areas 5900 25
147,500
Total Area Phase One 29480
Sub -Total
$1,041,150
Contingency:
Sitework & Building 10%
107,100
Hazardous materials assumption
75,000
Sub -Total
$182.100
CONSTRUCTION SUB -TOTAL
$1,253,250
NON -CONSTRUCTION
Survey/Selective exterior spot elevations
2,000
Existing interior systems evaluation:
Plumbing, HVAC, Electrical, Data, Voice, Fire Alarm &
Sprinkler
13,500
Minor On -Site Civil Engineering
3,000
Architectural Fee
127,500
Plumbing & HVAC
29,150
Electrical: power, lighting, fire alarm, voice & data infrastructure
16,500
Fire Protection
3850
Cost Estimating
10,000
Reimbursables — 25 bid sets
15,000
TOTAL A/E LUMP SUM FEE
220,500
Construction Testing: If required, coordinated by General Contractor
(reviewed & approved by architect and paid direct by owner)
5,000
Non -construction contingency; minor structural (if required), &
bid sets over 25 & mise.
21,250
NON -CONSTRUCTION SUB -TOTAL
246,750
PROJECT TOTAL
$1,500,000