An alternative way to help raise some additional funds to be
used toward the building of this facility would be to sell the
front five acres of land, which would bring an attractive price
because of the location. It is understood that the Town of
Mooresville plans to contribute toward the building of this
facility.
The board members were concerned over the increased cost above
the budgeted amount. It was stated that the cost of the facility
could be looked at as the actual drawings are done. At the present
time, a site plan showing the approximate location of the facility
and the road is needed for presentation to the Mooresville Planning
Board and the Mooresville Town Board.
MOTION from Commissioner Madison to approve the concept and
the site plan with the understanding that if the project can be
done right with less money, we will do it.
VOTING: Ayes - 5; Nays - 0.
(COMMISSIONER MADISON AND SUSAN BLUMENSTEIN LEFT THE MEETING AT
THIS POINT TO ATTEND A TRI -COUNTY MENTAL HEALTH BOARD MEETING IN
SALISBURY.)
RETAINER CONTRACT FOR ENGINEERING SERVICES WITH MUNICIPAL
ENGINEERING COMPANY, PA. IC CONTRACT #9S -IS: This contract was
submitted for the board's consideration by Mr. Joel Mashburn. A
question was raised about the hourly cost of the engineering firm.
Two informal quotations were received, and the other fee was much
higher per hour than the Municipal Engineering firm cost.
MOTION from Chairman Haire to approve the contract with
Municipal Engineering Company in accordance with their letter dated
April 19, 1995.
VOTING: Ayes - 4; Nays - 0.
REQUEST FOR ASSISTANCE WITH WATER AND SEWER TO THE NEW SITE OF
THE LAKE NORMAN REGIONAL MEDICAL CENTER FACILITY: Chairman Haire
brought to the attention of the board that Lake Norman Regional
Medical Center is relocating to the I-77, Exit 33 area, and a
question has been raised about whether or not the County would work
with Mooresville in extending water and sewer lines to the area on
the 70/30 arrangement, since this will be a $30 million facility.
Mr. Mashburn was to check and see if there was any assistance given
to Davis Community Hospital for water and sewer when that facility
was relocated on Old Mocksville Road and report back to the board.
APPROVAL OF J. N. PEASE CONTRACT FOR JAIL FACILITY IC CONTRACT
#95-16: Mr. Mashburn presented this to the board and said this
contract is in phases and can be stopped at any phase. After
discussion, MOTION was made by Commissioner Boone that the Board
approve the proposal for J. N. Pease to proceed with the consulting
services on the design of the jail.
VOTING: Ayes - 4; Nays - 0.
WATER AND SEWER ADDITIONAL FUNDS FOR SOUTHERN CONTAINER
CORPORATION'S BUILDING: Mr. Mashburn brought this to the board's
attention. There was a request for $186,000 of which 70% would be
paid by the county. They are now planning to turn the building
around on the lot and need the water to go to the other side of the
lot with their new location plan. This will cost more money for
the line extension. They are asking for an additional $60,000 and
70% of this would be Iredell County's portion. The board members
discussed whether or not they had run the water and sewer lines to
the actual building or just to the corner of the property in the
past. Mr. Mashburn was to check into this and advise the board at
the next meeting.