HomeMy WebLinkAboutC.054.93010_1154 (2)Vernon said the single -prime method was "cleaner." He said, "A general
contractor could only go so far in multi -primes." Vernon said a multi -prime project was
more difficult, even though it was less expensive. He said there was an $80,000
difference between the two methods for the project.
Mashburn said the general contractor assumed more responsibility in a single -
prime method.
Commissioner Madison voiced concerns about wasting $80,000.
Mashburn said the county could perform the project using the multi -prime
method. He said the staff was recommending that (1) the awarding of the contract be
delayed (2) permission be granted to obtain the design work for the lower level and (3)
permission be given to negotiate with the low bidders about the additional work.
UPDATE ON THE IREDELL COUNTY GOVERNMENT CENTER -
SOUTH (ICGC-S) CHANGE ORDERS & CONTINGENCY ACCOUNT:
Support Services Director Vernon said that when the ICGC-S architectural contract was
approved, the board requested updates on the amount of contingency being used in the
project. He said the contingency account had been depleted and $24,053 had been used
from the Furniture/Fixtures/Equipment account. Vernon then described the following
change orders and miscellaneous expenses.
# Account Reason
Amount
G-1 Contingency Unknown existing
$ 11,790
conditions
G_2 Contingency Unknown existing
17,675
conditions
G-3 Contingency Unknown existing
2,260
conditions
G-4 Contingency Unknown existing
4,492
conditions
G-5 Contingency Unknown existing
14,738
conditions
G-6 Contingency Unknown existing
4,477
conditions
G-7 Contingency & Unknown existing
15,852
Depreciable assets conditions
G-8 Contingency Unknown existing
3,314
conditions
_
G-9 General Fund Transfer Demolition of 3` /4
145,625
floors/DENR
Total change orders
$220,220
Total without DENR demolition = $74,595
Miscellaneous expenses (not part of construction contract)
1. Asbestos removal 0 floor for DENR project)
10,000
2. Mise. repairs to plumbing/HVAC piping not in contract
scope of work (completed by Parlier Plumbing)
12,137
3. Asbestos removal completed prior to construction
67,600
4. Asbestos removal found during construction (contingency)
29,641
5. Roof repairs from contingency
6,605
Upcoming work to be done -- change orders not processed
1. Repairs to HVAC chiller/cooling tower
49,445
2. Change orders verbally approved
1,881
Vernon predicted the facility would be ready to open in mid-August.
ADJ UChairman Johnson adjoume a briefing at 6:15 P.M.