Loading...
HomeMy WebLinkAboutC.054.93010_1048 (2)Request for Approval of a Sewer Bid Contract with the Bell Construction Company & Approval to Advertise for the Construction Bids for An Elevated Water Tank up to 1,000,000 Gallons for the West Farm Development Project/Millard Refrigeration Inc.: County Manager Mashburn said the West Farm Development site would accommodate future industrial development along with Millard Refrigeration. Benji Thomas, an engineer with West Consultants, said bids were opened on January 16, 2003, for the sewer line, and the low bid was from Bell Construction for $160,466. Thomas said that at the time the bids were opened, they were based on the plan for a four -inch sewer line from the Millard plant to Statesville's sewer system. He said recently, notice had been received about the possibility of serving additional "wet industry." Thomas said two additional scenarios had been proposed, and these were: Scenario 11 (6" forcemain) Construct pump station on/near Millard's property and increase size to accommodate the larger forcemain and to accommodate possible wet industry. The pump station would be owned by Millard, at least initially, and the forcemain by the county. Total cost: $248,276 Iredell County's Obligation $112,800 (over five years) $ 87,810 during construction (est.) Immediate Capacity of Pump Station 100,000 gal./day Ultimate capacity of forcemain 250,000 gal/day Scenario III (8" forcemain) Construct pump station on/near Millard's property and increase size to accommodate the larger forcemain and to accommodate possible wet industry. Again, the pump station would be owned by Millard, at least initially, and the forcemain by the county. In this scenario, it is assumed that at new pump station (cost not included here) would one day be constructed at the low point of the West Farm "industrial park," thus serving a larger area as well as greater flows. Total cost: $277,039.50 (est.) Iredell County's Obligation $112,800 (over five years) $116,573.50 during construction (est.) Immediate Capacity of Pump Station: 180,000 gal./day Ultimate Capacity of Forcemain 500,000 gal/day Original concept or Scenario I (4" forcemain) Construct project as already designed and bid. Pump station would be built on Millard Refrigerated Services property and owned by Millard. Forcemain owned by county. Total Cost: $160,466 (bid price) Iredell County's Obligation: $112,800 (over five years) Immediate Capacity of Pump Station: 15,000 gal./day Ultimate Capacity of Forcemain 100,000 gal./day Mr. Thomas suggested for the board to choose scenario 11 or III. He said the eight -inch line would provide an extra benefit for the county in the long run. Thomas said a request was also being made for the board to authorize the consulting group to advertise for the construction of the water tank. Jeff McKay, the Director of the Greater Statesville Development Corporation (GSDC), said the site had always been of interest to industrial prospects, but due to the lack of infrastructure, nothing had developed. McKay said in the past few weeks more interest had surfaced, especially with some food- processing operations that would complement Millard's services. McKay said the city last night had chosen not to participate in a one-third split up -front, but the council would review the possibility of this type of reimbursement if annexation