HomeMy WebLinkAboutC.054.93010_0661 (2)Alternate No. 1: Amount to be deducted from the Base Bid to eliminate the entrance additions (415,700). Alternate No. 2: Amount to be deducted from the base bid to eliminate the counter at work area 105. (This alternate was not used.) Alternate No. 3: Amount to be deducted from the base bid to eliminate the counter and swing gate at vital area 112. (This alternate was not used.) Alternate No. 4: Amount to increase the base bid to repaint all exterior CMU with Benjamin Moore "Off White 105-1 A," (+$4,800) *Streamline's bid of $377,105 was reduced by $15,700 using alternate # 1 and eliminating the entrance additions. Also, the bid amount then ($361,405) was increased by adding alternate #4 (repainting of exterior) in the amount of $4,800 to arrive at the $366,205 (general construction amount used in the project ordinance). The amended Capital Project Ordinance is now as follows: Iredell County, North Carolina Amended Capital Project Ordinance Hall of Justice Annex Note: There is no change in the total dollars budgeted. This amendwent allocates costs between separate contracts. Be it Ordained by the Board of County Commissioners of Iredell County, North Carolina: Section 1. The following costs of the design, renovation, and furnishing of the Hall of Justice Annex (formerly Iredell Agricultural Center) shall be financed by this find: Design & Engineering 42,000 General Construction 366,205 Plumbing 33,500 Mechanical 109,625 Electrical 64,630 Furniture & Equipment 138.440 Section 2. Funds for this Capital Project Fund will be provided from the following source: Transfers from Capital Reserve Fund $ Section 3. This Capital Project Fund shall continue until the project is complete. Section 4. Payments from this Capital Project Fund shall be authorized by the County Manager or his designee. Section 5. Upon completion of the construction project all funds remaining in this Capital Project Fund will be transferred back to the Capital Reserve Fund. A complete summary, of all bids received, is as follows: Separate Prime General Contract Streamline W.G. Holden Brooks GC Wilkie Const. BH Bryan Time 145 150 150 180 150 Base Bid $ 377,105 $ 426,588 $ 479,453 $ 468,816 $ 390,070 Alt, I - 15,700 - 14,136 24,000 22,200 9,400 Alt.2 2000 925 1,500 925 925 Alt.3 1000 875 1,300 875 875 Alt.4 + 4800 + 5,220 + 5,200 + 4,800 + 9,987 Note: No bids received from American Construction, Walker Construction, Mullet Construction, and Donald Neal Construction.