Loading...
HomeMy WebLinkAboutC.054.93010_0651 (2)IREDELL COUNTY BOARD OF COMMISSIONERS BRIEFING MINUTES FEBRUARY g 2002 The Iredell County Board of Commissioners met in Briefing Session on Tuesday , h Center Street, Statesville, NC. February 5, 2002, at 5:00 p.my Government Center ., in the Iredell Count Conference Room), 200 Sout (South Wing Present: Chairman Sara Haire Tice Vice Chairman Karen B. Ray Tommy E. Bowles Steve D. Johnson R. Godfrey Williams StaffStaff Present y Manager Joel Mashburn, --__ Count Biumenstem, Support Services Director Jim Vernon, burn, Finance Director Susan Inspections/Code Enforcement Director Lynn Niblock, Chief DeputyRick Supervisor Ron the Sheriffs Department, Fire Marshal Chuck Gallyon, Libra Smith, and Clerk to the Board Jean Moore. Rick Dowdte with Library Director Steve Messick, CALL TO ORDER by Chairman Tice. UPDATE ON THE PROGRESS BEING MADE IN PROPERTY LOCATED OFF TURNERSBURG HIGHWAY TO BE USED FOR ADDITIONAL JAIL SPACE; OBTAINING dle aid there continued to be a growing (former prison unit) g g need to find space to house Chief Deputy akdD�eJ3i1 had 250 inmates this weekend and there were 222 confined at the facility sai said he was continuing with discussions with the Department of utilizing the former prison site. today. Dowdte Corrections about upport Services ctor m Vernon id the major drawback site wassthe lack of a septic etreatm treatment system. aVernon said the health enlvithe ronmen an supervisor was doing an analysis on what was needed. Mr. Vernon said that if a local septic system was designed,1 would be some costs -- the site could house 40-50 inmates. Vernon noted there minimum of $125,000. Dowdle said he could possibly house 92 inmates at the site, but not with the Present sewer situation. Chief Dowdle said his discussions with the Department of Transportation representatives revealed that they would probably attach a sewer line to the 1-77 bridge -- they wouldn't bore under the interstate. He added that in time, tite prison property was supposed to revert over to the Department of Transportation. ARCHITECTURAL FOR A DISCUSSION/DECISION REGARDING RAL FIRM FOR THE NEW IREDELL COUNTY LIBRARY: January 12, 2002, the board members visited a library designed h in Lexington, SC. On JanuaryRARY. O° NC, designed b son Moo, the board members visited arlibrarytin Hi kden ory, y Calloway Johnson Moore West. County Manager Mashburn said there was $2.8 million in the capital reserve fund. He said there were adequate funds for the design work. Chairman Tice said she wanted a library building that had character -- something that could be a focal point for the county. Mashburn said the board needed to choose an architectural firm. He said then, the chosen firm would have to submit a fee amount. Library Director Messick, County Manager Mashburn, and Commissioner Johnson, said they were most satisfied with the Craig Gaulden Davis firm. It was the consensus of the board to allow the staff to negotiate a contract with Craig Gaulden Davis.