Loading...
HomeMy WebLinkAboutC.054.93008_1991TIME 190 days 270 days 275 days 270 days 250 days BASE BID 2,140,000 2,245,000 2,213,000 2,345,000 2,253,300 Alt. G1 -30,600 -29,600 - 7,500 -26,000 -24,000 Alt. G2 -40,700 -42,000 -43,178 -45,700 -36,000 Alt. G3 - 735 - 900 - 800 - 900 - 800 Alt. G4 -22,000 -28,700 -19,950 -17,500 -16,800 Alt. G5 -18,000 -25,000 -12,500 -19,000 -18,000 Alt. G6 - 9,600 - 6,000 - 1,000 - 2,800 - 7,500 Alt. G7 - 1,050 - 1,200 - 1,100 - 2,000 - 1,000 Alt. G8 - 1,274 - 1,100 - 1,274 - 1,700 - 1,250 Alt. G9 + 600 + 500 + 500 + 600 + 600 Alt. M1 + 2,000 + 4,400 + 4,400 - + 4,235 Alt. E1 - 6,900 - 7,000 - 6,900 -14,700 -14,000 UP FP -1 +72,000 + 60 + 75 + 80 + 70 SEPARATE PRIME PLUMBING CONTRACT Bidder Acorn Castor* Mecklenburg Security Bid Bond Bid Bond Bid Bond Addenda 1,2,3,4 1,2,3,4 1,2,3,4 Time Per G/C With G/C With G/C Base Bid 177,721 148,666 163,000 G-1 - 750 - 675 SEPARATE PRIME MECHANICAL CONTRACT Bidder Climate* Comfort Griffin Ingold Security Bid Bond Bid Bond Bid Bond Bid Bond Addenda 1,2,3,4 1,2,3,4 1,2,3 1,2,3,4 Time With G/C With G/C 180 days As needed Base Bid 222,600 256,730 332,668 283,300 Alt. M-1 No bid + 4,235 - 5,000 -13,200 SEPARATE PRIME ELECTRICAL CONTRACT Bidder EF Belk* Port City Commercial Security Bid Bond Bond Bid Bond Addenda 1-4 1-4 1-4 Time W G/C W G/C 320 days Base Bid 219,881 279,000 395,000 Alt E-1 - 7,483 -13,000 N/A SEPARATE PRIME FIRE PROTECTION Bidder Carolina Fire Prtc* K & S Spr Security Bid Bond Bid bond Cashier Check Addenda 1,2,3,4 1,2,3,4 1,2,3,4 Time 75 days 25 days - Base Bid 59,785 57,000 58,632 UP EP -1 +75 +75 +72 Alt. G-1 -130 -150 *designates low bid in each category. Single Prime Low Bid Carmel Const., Charlotte $2,140,000 Multi Prime Low Bid Crescent Const., Concord $1,446,500 Castor Plumbing, Davidson $ 148,666 �j