HomeMy WebLinkAboutC.054.93008_1579 (2)113'2
20
SR 1612 from End of Pavement c Dead End
0.12
15,000
Grade, Base and Surface
PROPERTY OWNER'S PARTICIPATION
6.8224
Imperial Drive (New Addition)
0.55
45,000
from SR 2197 to Dead End
Grade, Base and Surface
TOTAL FUNDS AVAILABLE $1,122,995
LESS PROGRAM 1,042,300
BALANCE IN RESERVE 80,695
In the event the Highway Fund Bill before the 1989 Legislature
is funded,
the
following
additional improvements would be programmed in
Iredell County.
PRIORITY
DESCRIPTION
MILES
AMOUNT
RURAL
5
SR 1871 from NC 115 to SR 1869
Grade, Base, Surface and Structure
Estimated Cost:
Roadway $295,000
Structure (Br.240) 60,000
Total 355,000
Previously Funded 150,000
Cost 205,000
p 46
205,000
Fund Remaining
6
SR 2356 from US 70 to Dead End
0.63
75,000
Grade, Base and Surface
7
SR 1559 from SR 1554 to Dead End
1.65
195,000
Grade, Base and Surface
Subdivision
21 SR 1539 from SR 1540 to Dead End
0.10
12,000
Grade, Base and Surface
22
Sr 1272 from SR 1137 to Dead End
0.21
26,000
Grade, Base and Surface
23
SR 1352 from US 70 to SR 1351
0.13
16,000
Grade, Base and Surface
24
SR 1651 from NC 115 to Dead End
0.30
36,000
Grade, Base and Surface
25
SR 1130 from NC 115 to Dead End
0 19
23,000
Grade, Base and Surface
26
SR 1351 from SR 1350 to SR 1386
0.05
7,000
Grade, Base and Surface
27
SR 1490 from SR 1004 to SR 1437
0.38
46,000
Grade, Base and Surface
28
SR 2472 from SR 2354 to Dead End
0.05
7,000
Grade, Base and Surface
29
SR 2403 from SR 2333 to Dead End
0.12
15,000
Grade, Base and Surface
30
SR 1206 from End of Pavement to Dead End
0 22
27,000
Grade, Base and Surface
31
SR 2394 from SR 2333 to SR 2403
0.17
21,000
Grade, Base and Surface
32
SR 1213 from SR 1147 to Dead End
0.14
17,000
Grade, Base and Surface
TOTAL FUNDS AVAILABLE $1,856,797
LESS PROGRAM 70,300
RESERVE 66,497
CONTINGENCY PLAN
8
SR 2130 from SR 2128 to Davie Co. Line
0 g4
113,000
Grade, Base and Surface
0