Loading...
HomeMy WebLinkAboutC.054.93008_1579 (2)113'2 20 SR 1612 from End of Pavement c Dead End 0.12 15,000 Grade, Base and Surface PROPERTY OWNER'S PARTICIPATION 6.8224 Imperial Drive (New Addition) 0.55 45,000 from SR 2197 to Dead End Grade, Base and Surface TOTAL FUNDS AVAILABLE $1,122,995 LESS PROGRAM 1,042,300 BALANCE IN RESERVE 80,695 In the event the Highway Fund Bill before the 1989 Legislature is funded, the following additional improvements would be programmed in Iredell County. PRIORITY DESCRIPTION MILES AMOUNT RURAL 5 SR 1871 from NC 115 to SR 1869 Grade, Base, Surface and Structure Estimated Cost: Roadway $295,000 Structure (Br.240) 60,000 Total 355,000 Previously Funded 150,000 Cost 205,000 p 46 205,000 Fund Remaining 6 SR 2356 from US 70 to Dead End 0.63 75,000 Grade, Base and Surface 7 SR 1559 from SR 1554 to Dead End 1.65 195,000 Grade, Base and Surface Subdivision 21 SR 1539 from SR 1540 to Dead End 0.10 12,000 Grade, Base and Surface 22 Sr 1272 from SR 1137 to Dead End 0.21 26,000 Grade, Base and Surface 23 SR 1352 from US 70 to SR 1351 0.13 16,000 Grade, Base and Surface 24 SR 1651 from NC 115 to Dead End 0.30 36,000 Grade, Base and Surface 25 SR 1130 from NC 115 to Dead End 0 19 23,000 Grade, Base and Surface 26 SR 1351 from SR 1350 to SR 1386 0.05 7,000 Grade, Base and Surface 27 SR 1490 from SR 1004 to SR 1437 0.38 46,000 Grade, Base and Surface 28 SR 2472 from SR 2354 to Dead End 0.05 7,000 Grade, Base and Surface 29 SR 2403 from SR 2333 to Dead End 0.12 15,000 Grade, Base and Surface 30 SR 1206 from End of Pavement to Dead End 0 22 27,000 Grade, Base and Surface 31 SR 2394 from SR 2333 to SR 2403 0.17 21,000 Grade, Base and Surface 32 SR 1213 from SR 1147 to Dead End 0.14 17,000 Grade, Base and Surface TOTAL FUNDS AVAILABLE $1,856,797 LESS PROGRAM 70,300 RESERVE 66,497 CONTINGENCY PLAN 8 SR 2130 from SR 2128 to Davie Co. Line 0 g4 113,000 Grade, Base and Surface 0