Loading...
HomeMy WebLinkAboutC.054.93008_1578 (2)PRIORITY # DESCRIPTION MILES AMOUNT Rural ` 1 SR 2319 from SR 2318 to end of pavement Grade, Base and Surface 0.53 S 64,000 2 SR 2199 from SR 2163 to SR 2146 1.20 145,000 Grade, Base and Surface 3 SR 2363 from US 70 to Rowan Co. Line 1.70 204,000 Grade, Base and Surface 4 SR 1301 from SR 1303 to SR 1478 0.54 66,000 Grade, Base and Surface 5 SR 1871 from NC 115 to SR 1869 Grade, Base and Surface 2.46 Estimated Cost: Roadway $295,000 Structure (BR #240) 60,000 TOTAL $355,000 Fund Grade and Stabilize Only 150,000 Subdivision 1 SR 2459 from SR 2320 to SR 2493 Grade, Base and Surface 0.38 46,000 2 SR 2428 from SR 2409 to Dead End 0.12 15,000 Grade, Base and Surface 3 SR 2470 from SR 2333 to Dead End Grade, Base and Surface 0.13 16,000 4 SR 1423 from End of Pave to Dead End Grade, Base and Surface 0.11 14,000 5 SR 1430 from US 21 to Dead End Grade, Base and Surface 0.21 26,000 6 SR 1469 from SR 1356 to Dead End Grade, Base and Surface 0.16 20,000 7 SR 2409 from SR 2339 to Dead End Grade, Base and Surface 0.09 12,000 8 SR 1433 from SR 1302 to Dead End 0.27 33,000 Grade, Base and Surface 9 SR 1454 from SR 1325 to Dead End 0.08 10,000 Grade, Base and Surface 10 SR 1423 from SR 1347 to dead End Grade, Base and Surface 0.03 4,000 11 SR 1961 from End of Pavement to End of Pave. 0.02 2,800 Grade, Base and Surface 12 SR 2495 from SR 2358 to Dead End Grade, Base and Surface 0.24 29,000 13 SR 1422 from SR 1333 to Dead End Grade, Base and Surface 0.16 20,000 14 SR 1389 from US 21 to Dead End 0.12 15,000 Grade, Base and Surface 15 SR 2195 from SR 2166 to Dead End Grade, Base and Surface 0.17 21,000 16 SR 1976 from SR 1869 to Dead End 0.13 16,000 Grade, Base and Surface 17 SR 1258 from SR 1112 to SR 1261 0.25 30,000 Grade, Base and Surface 16 SR 1941 from SR 1892 to Dead End 0.12 15,000 Grade, Base and Surface 19 SR 1702 from NC 90 to Dead End 0.07 8,500 Grade, Base and Surface I , `